Loading...
HomeMy WebLinkAboutAgenda Packet_Full Gregory Smith, Chair Washington County Vernell Doyle Lloyd Yavener, Vice Chair - - - Michael Lushbaugh Ann Aldrich i Justin Bedard Brianna Candelaria - Wayne K. Keefer, BOCC Rep HISTORIC DISTRICT COMMISSION OF WASHINGTON COUNTY , MARYLAND AGENDA March 6, 2024, 7:00 p.m. Washington County Administration Complex, 100 West Washington Street, Room 2001, Hagerstown, MD 21740 CALL TO ORDER AND ROLL CALL MINUTES 1. Minutes of the November 1, 2023 meeting NEW BUSINESS 1. HTC— 1004 The Terrace, Review of Expenses * (Discussion/Approval) Review of documentation provided for County Tax Credit related to rehabilitation work to determine eligible expenses * 2. 2024-00586, 1244 Frederick Street, Demolition Permit(Discussion/Support) Proposed demolition of 1,288 sq.ft. dwelling and any associated outbuildings, fill in basement, remove driveway pavement and sidewalks (MIHP 1887, Ravenswood Heights) OTHER BUSINESS 1. Preservation Month 2024* 2. Staff Report a. Staff Reviews b. CAMP Training Recap c. MHT Correspondence —Smithsburg* d. MAHDC Symposium Invite * e. House Bill Updates (cemeteries and road/place naming)* f. 250th Updates * g. Historic Resource Tax Credit Ordinance Update ELECTION OF OFFICERS 1. Review of Term Expirations ADJOURNMENT UPCOMING MEETING 1. Wednesday, April 3, 2024, 7:00 p.m. *attachments The Historic District Commission reserves the right to vary the order in which the cases are called. Individuals requiring special accommodations are requested to contact the Washington County Planning Department at 240- 313-2430 to make arrangements no later than ten (10) days prior to the meeting. Notice is given that the agenda may be amended at any time up to and including the meeting. 747 Northern Avenue Hagerstown,MD 21742 240.313.2430 240.313.2431 7-1-1 WWW.WASHCO-MD.NET MINUTES OF THE HISTORIC DISTRICT COMMISSION FOR WASHINGTON COUNTY November 1, 2023 The Washington County Historic District Commission held its regular monthly meeting on Wednesday, November 1, 2023 at 7:00 p.m. in the Washington County Administration Complex, 100 W Washington Street, Room 2001, Hagerstown, MD. CALL TO ORDER AND ROLL CALL The Chairman called the meeting to order at 7:00 p.m. Commission members present were: Greg Smith, Chairman, Lloyd Yavener, Michael Lushbaugh, Vernell Doyle and Justin Bedard. Staff members present were: Washington County Department of Planning & Zoning: Meghan Jenkins, GIS Coordinator and HDC Staff member. MINUTES Motion and Vote: Mr. Yavener made a motion to approve the minutes of the October 4, 2023 meeting as presented. The motion was seconded by Mr. Lushbaugh and unanimously approved. NEW BUSINESS 11609 Kieffer Funk Road [SP-23-037] Ms. Jenkins presented a site plan for a proposed solar generating system on property located at 11609 Kieffer Funk Road. The solar array will contain 26,416 panels and 47 inverters as well as a 7 foot fence. This property is split with zoning designations of RT(Residential Transition) and A(R) (Agricultural Rural). The solar array is proposed on the portion of property zoned A(R)which is outside the Growth Area.There are no historic resources adjacent to the proposed solar array; however,there are a few historic resources close by. None of these sites are eligible for the National Register.There is a family cemetery on the parcel which contains the dwelling; however, it is not close to the proposed solar arrays. Discussion and Comments: Mr. Bedard asked if an archeological survey was required by MHT. Ms.Jenkins said there were no comments regarding an archeological survey included in MHT's comments but she will follow up on this question. Mr. Smith noted there has been a lot of controversary surrounding this project in the past. Ms. Jenkins stated neighbors were concerned about the visual impacts to their properties. Members noted that most of the historic structures are surrounded by significant tree cover.The standard note on the plan that the property contains historic resources is sufficient. 12440 Burkholder Lane, Lot 1 for Martin Property [S-23-058] Ms. Jenkins presented a subdivision plat for the Martin property located at 12440 Burkholder Lane. A warehouse and connecting road to Northpoint Development is proposed on Lot 1 (123+/-acres) with the remaining lands containing the Kershner-Burkholder Farm (MIHP 1336). Discussion and Comments: Ms. Jenkins noted that the County may require the developer to allow space on the site for future connections to other roads. There was a brief discussion regarding the HP overlay on the dwelling. Ms. Jenkins stated that was suggested during the preliminary consultation and a letter was sent to the property owner. Ms. Jenkins noted that during the Dickinson Farm site visit there was a cemetery mentioned on one corner of the subject property. She will check if an archeological survey will be completed. Mr. Bedard suggested that an evaluation for National Register eligibility should also be conducted.The standard note indicating historic resources on the remaining lands should be included on the subdivision. OTHER BUSINESS Staff Report • Staff Reviews - Ms. Jenkins provided a written summary. • 2024 Meeting calendar— Ms.Jenkins presented a draft calendar for the 2024 HDC meetings. The only date of concern was the July 3'd meeting. Members stated they were fine with that date. • The election of officers will be held during the December meeting. Mr. Yavener will not be in attendance at that meeting; however, he is willing to continue to serve as the Vice-Chair, if nominated and elected. • The draft CLG Annual Report will be available sometime in December. Ms.Jenkins asked members to please send any training certifications received during the past year and any updated resumes to her. • Ms. Jenkins is trying to organize a historic subcommittee to participate in the 250th celebration committee.She has reached out to the Washington County Historic Society for their participation. To date, she has two participants from the HAC, Rachel Nichols from HCWHA, Rebecca Conrad from the Conococheague DAR, Dennis Frey, Kathryn Mackey from the Western Maryland Room at the Library, and David Wiles with Clear Spring Historic Society. She has also contacted a representative of the Antietam DAR. • Historic Resource Tax Credit Ordinance Update — Ms. Jenkins stated the County Attorney is planning to have his questions and comments back to her next week. • CAMP Training — Ms. Jenkins announced that CAMP training for next year is scheduled on February 20th and 21st from 5 to 8:45 pm both evenings. Topics will include: Legal Basics Meeting Procedures, Standards and Guidelines for Design Review, Community Outreach Alternative Materials, and Commissions and Local Building Code. This will be a virtual training with other participants from Maryland and West Virginia. ADJOURNMENT Mr. Lushbaugh made a motion to adjourn the meeting at 8:00 pm. The motion was seconded by Mr. Yavener and so ordered by the Chairman. Gregory Smith, Chairman Gregory Smith, Choir { Washington County Vernell Doyle Lloyd Yovener, Vice Choir �3 Michael Lushbough Ann Aldrich ■ Kourtney Lowery Brionno Condelorio Jeffrey A. Cline, BOCC Rep HISTORIC DISTRICT COMMISSION OF WASHINGTON COUNTY , MARYLAND TO: John Williamson 1004 The Terrace Hagerstown, MD 21742 FROM : Meghan Jenkins, GISP Historic District Commission Staff 747 Northern Avenue Hagerstown, MD 21742 mjenl<ins@washco-md.net DATE: January 6, 2023 SUBJ: Application for Historic Property Tax Credit Mr. Williamson, Your property located at 1004 The Terrace in the City of Hagerstown contributes to a qualified area (WA-HAG-136, Oak Hill District) for the County's Historic Property Tax Credit. Our office received your application and has had time to review the information presented. The application will not be complete and presented to the HDC for approval and determination of credit amount until work is completed and the following items have been provided: 1. Please forward the Certificate of Appropriateness resulting from a permit and review by the City of Hagerstown for Design Review for properties in a Historic District. If not required, please provide a memo from the City of Hagerstown stating such. 2. Any related inspection records from permitted activities for the work should also be supplied. 3. Please forward any additional detailed quotes as well as invoices/receipts upon completion of work. 4. Once the project is completed, please provide AFTER photos. Our office will keep these photos and cannot return them. We do have the BEFORE photos already provided for our records. Again, this correspondence acknowledges our receipt of your initial application, and that the property does qualify to apply for the Credit. Please be sure that work follows the Secretary of Interior's 747 Northern Avenue Hagerstown,MD 21742 240.313.2430 240.313.2431 7-1-1 WWW.WASHCO-MD.NET Standards for Rehabilitation and Guidelines for Rehabilitation of Historic Buildings as well as the County's Design Guidelines for Historic Properties. Information on both can be found online here: https://www.washco-md.net/planning-zoning/historic-district-commission/ If you have any additional questions, you may contact our office. Sincerely, Meghan Jenkins, GISP Historic District Commission Staff 1004 The Terrace Hagerstown, MD 21742 December 15, 2023 Ms. Meghan Jenkins Historic District Commission 747 Northern Ave. Hagerstown, Maryland 21742 Subject: Project 2023-015 Dear Ms. Jenkins The thumb drive includes the completed project documentation I have provided to the Maryland Historical Trust staff for them to review. My project was a lot more involved than I initially expected. A significant amount of deterioration could not be seen from the ground, especially since most of the work was two stories high. Once the contractor set up the scaffolding, he was able to document the deterioration that needed to be repaired. We do not believe any significant work had been performed on the house's exterior for forty-plus years, and most of what was repaired was original to the house construction in 1915. I was home for both phases of the project (windows and exterior) and could watch each day's progress. My contractor, Mitchell Brown, and his company, Preservation for Posterity, impressed me with their knowledge of preservation work and their efficiency. I highly recommend them for restoration and preservation work, which is all they do. Please let me know if you need additional information, I can be reached at 301-991-2344. Re ds��, // Jo Williamson 1004 The Terrace Hagerstown, MD 21742 December 15, 2023 Ms. Dana Marks Halpert Department of Planning Maryland Historical Trust 100 Community Place Crownsville, Maryland 21032 Subject: Project 2023-015 Dear MS. Halpert: I've included all of the information required to be submitted for Part 3 approval. I have met all of the items identified on the Conditions Sheet. The rear patio tile replacement was completed by a separate contractor and no expenses were included in this submission. My project was a lot more involved than I initially expected. Item # 1, refurbishing the original windows, was slightly less than expected. Item#2 was significantly more than expected. I provided the initial estimate for Part 2. My contractor provided a detailed estimate for the exterior work in March 2023 for $25,000 and told me he would likely find more deterioration when he could get up on scaffolding. As the project proceeded, he identified the additional deterioration that could not be seen from the ground. I have included numerous "before" pictures that show what it looked like from the ground and what he found once he got a closer look. We do not believe any significant work had been performed on the exterior of the house for forty-plus years, and the majority of what was repaired was original to the house construction in 1915. I was home for both phases of the project(windows and exterior) and was able to watch the progress each day. My contractor, Mitchell Brown, and his company, Preservation for Posterity, impressed me with their knowledge of preservation work and their efficiency. I highly recommend them for restoration and preservation work which is all they do. Please let me know if you need additional information. Re ards, Williamson Maryland Historical Trust . Maryland Historic Revitalization Tax Credit 7 Revised 10125/2023 DEPARTMENT OF PLANNING HOMEOWNER CERTIFICATION APPLICATION MARYLAND HISTORICAL TRUST PART 3 - REQUEST FOR CERTIFICATION OF COMPLETED WORK MHT Project Number(MHT office use only) 2O Instructions:This page must bear the applicant's electric signature and must be dated. A copy of this form will be provided to the Comptroller of the Treasury. 1. Property Name John and Theresa Williamson residence Street 1004 The Terrace City Hagerstown Zip 21742 County Washington is the property a certified historic structure? ❑yes t..l no If yes,date of MHT certification OR date of National Register/local listing 2. Project Data Project start dale February 15, 2023 Project completion date October 15, 2023 Did the project take more than 24 months to complete? ❑yes- 0 no It answer is yes,you may only claim expenditures incurred in a 24 month period ending with or within the taxable year Is the required"Part 3-Itemized Expense Spreadsheet"included with corresponding paid invoices/receipts? ❑r yes Total rehabilitation costs(including new construction,site work,appliances,etc.) $50,130 Total ineligible expenses attributed to new construction,site work,appliances,etc. - $2,1 60 Total ineligible funding,including but not limited to state or local grants or - $0 insurance reimbursement funds as described in the Part 2(see instructions). Total Qualified Rehabilitation Expenditures(ORE)-Do not round numbers = 7_970 (the 20%tax credit will be based on this amount,which may not exceed$250,000) 3. Project Contact (if different from applicant) Name Company Street City State Zip Telephone Email Address 4. Applicant List all additional owners on next page. 1 hereby apply for certification of the rehabilitation work described above for purposes of the Historic Revitalization Tax Credit.I hereby attest that,to the best of my knowledge,the information provided is correct,and that the completed rehabilitation is consistent with the work described in Part 2 of the Maryland Historic Revitalization Tax Credit Application Part-2 certified by the Maryland Historical Trust.I also attest that the structure is not owned by the State of Maryland,a political subdivision of the State,or the Federal government,and that l own,as my residence,the property or the portion of the property,described above,excepting those curatorship properties owned by DNR. I understand that intensional falsification of factual representations in this application are subject to civil penalties and imprisonment for up to 10 years pursuant to Tax General Article§§13-703 and 13-1O02(b).Annotated Code of Maryland. Name John Williamson Signature Dale 12/1 5/2023 Last 4 digits of SSN(or Taxpayer Identification Number) 9389 Street 1004 The Terrace City Hagerstown State MD Zip 21742 Telephone 301-991-2344 Email Address Jnwmson@aol.eom MHT Official Use Only The Maryland Historical Trust has reviewed the Historic Revitalization Tax Credit Application—Part 3 for the above-listed"certified historic structure"and has determined that: ❑ the completed rehabilitation is consistent with the Secretary of the Interior's Standards for Rehabilitation and is consistent with the historic character of the property and, where applicable,the district in which it is located.Effective the date indicated below,the rehabilitation of the"certified historic structure"is hereby designated a"certified rehabilitation."Questions concerning specific tax consequences or interpretations of Maryland tax law should be addressed to the Comptroller of the Treasury.Completed projects may be inspected by an authorized representative of the MHT Director to determine if the work meets the Standards for Rehabilitation.The MHT Director reserves the right to make inspections at any time up to five years after completion of the rehabilitation and to revoke certification,if it is determined that the rehabilitation project was not undertaken as presented by the owner in the application form and supporting documentation,or the owner,upon obtaining certification,undertook unapproved further alterations as part of the rehabilitation project inconsistent with the Secretary's Standards for Rehabilitation. l� the completed rehabilitation is not consistent with the Secretary of the Interior's Standards for Rehabilitation,eligibility requirements,and/or does not comply with program requirements and therefore certification is denied. Date Maryland Historical Trust Authorized Signature ❑ MHT comments attached Maryland Historical Trust I 100 Community Place/Crownsville.MD 21032 1 mht.maryland.gov HOMEOWNER CERTIFICATION APPLICATION PART 3 - REQUEST FOR CERTIFICATION OF COMPLETED WORK Property name John and Theresa Williamson residence Property address 1004 The Terrace, Hagerstown, Maryland 21742 5. Additional Owners Continue on additional sheets as needed to list all owners. Name Theresa Williamson SSN or Taxpayer Identification Number 6158 Street Address City State Zip Name SSN or Taxpayer Identification Number Street Address City State Zip Name SSN or Taxpayer Identification Number Street Address City State Zip Name SSN or Taxpayer Identification Number Street Address City State Zip 6. Itemized Expense Spreadsheet Attach the itemized spreadsheet and supporting documentation(paid invoices/receipts/cancelled checks)to the Part 3 Application. Supporting documentation must be keyed to the spreadsheet.Include both eligible and ineligible expenses. Page 2 of 3 HOMEOWNER CERTIFICATION APPLICATION PART 3—REQUEST FOR CERTIFICATION OF COMPLETED WORK MANDATORY APPLICATION CHECKLIST Property Address Instructions: After completing your Part 3 application, fill out this checklist to ensure that your application contains at least the minimum documentation required for MHT staff review.This checklist is based on the detailed information included in the Homeowner Instructions.Read and check each section carefully;the application review period will not begin until a completed application with checklist is submitted. ■ APPLICATION FORM-I filled in all applicable fields including the last 4 digits of the social security number of all owners (if)ointly owned). I understand that MHT staff may not fill in any missing information on behalf of me;therefore if my application is missing information it will be returned, ■ SIGNATURE- I signed and dated the Part 3 application and Mandatory Application Checklist in accordance with MHT's signature guidelines. ■ ITEMIZED EXPENSE SPREADSHEET-I have included a spreadsheet of all of my itemized expenses,filled out according to the instructions,with eligible and ineligible expenses clearly delineated. For each item on the spreadsheet I have included supporting documentation consisting of BOTH (1)a copy of the invoice or receipt,showing which goods or services were purchased,and (2)certifiable proof of payment such as a credit card receipt or canceled check. All supporting documentation is keyed to the spreadsheet. ■ PHOTOGRAPHS- I have prepared all photographs in accordance MHT's photographic guidelines. ■ REVIEW FEE-I will pay the remainder of review fee when sent an electronic invoice by the Maryland Historical Trust.I understand that payment must be made within ten (10)days of receiving the invoice.The review fee is 3%of the credit amount based on the GREATER of the Part 2 estimated Total Qualified Rehabilitation Expenditures(QRE)or the final total QRE in the Part 3 application,minus the $10 Part 2 review fee. -If Part 3 final QRE is higher than the estimated Part 2 QRE:((Part 3 QRE x.20)x.03)-$10=final review fee -If Part 3 final QRE is lower than the estimated Part 2 QRE:((Part 2 QRE x.20)x.03)-$10=final review fee ■ DUPLICATE COPY OF ALL APPLICATION MATERIALS- I have saved a complete copy of all materials for my records. I attest that I have read and understand the Historic Revitalization Tax Credit Application and L�I Instructions. Name - (fQ lr\ 1 r!/f fY} Signature '" Date / ZL14 Z Page 3 of 3 / p / 29 2 7f 72 C1 - j a- I PRESERVATION Prepared For LI FOR POSTERITY SPKC3ALIGIAO I I:HISTORIC PRESTRYATION John Williamson 1004, The Terrace Hagerstown , Md 17268 (310) 991-2344 Preservation For Posterity Estimate # 69 MHIC# 139572 Date 12/27/2022 1084 Dianne Drive Business / Tax# EIN 82-2143806 Waynesboro, RA 17268 Phone: (301) 992-8340 Email: preservationforthepeople@gmail.com Description Total Weatherstripping lower sash/casement $11,000.00 The lower sash will be removed and meeting rail alignment, weatherstripping includes the following a crush bead in the meeting rail and the lower stile where the sash hits the subsill the interior window stops will receive a feather bead this will allow the sash to operate and when closed seal 96%of air gaps. Interior touch up paint included along with new sash ropes in the lower sash.44 total Subtotal $11,000.00 Total $11,000.00 Please make the check payable to: Preservation For Posterity Please print and or save this invoice for your records within 10 days of issued Payment dew upon completion of project and or stages 72r7// 141-5 -! CE, r'-' S'ir/�� i/� 1S f �G�L Etc f F/ 127 �2 / 1 i - rnv�c � � � 1, f� I .. PRESERVATION Prepared For FOR POSTERITY 5PECIALIZIN4 IN NIETORIC PRESERVATION John Williamson 10Q4, The Terrace Hagerstown , Md 17268 (310) 991-2344 Preservation For Posterity MNIC# 139572 Estimate # 76 Date 03/12/2023 1084 Dianne Drive Business I Tax# EIN 82-2143806 Waynesboro, P.A 17268 Phone: (301) 992-8340 Email: preservationforthepeople@gmail,corn Description Total exterior repairs Jhon, �Q.r7Q:0a Hope you had a fantastic time at the cabin with your brother Thanks for taking the time to walk with me around your house, I believe included everything we discussed, Front of house dormer crown repair matched to existing profile Scaffolding will be set up if we have a shaper blade that matches the cost will be 400$ less Front porch T&G flooring replacement A few treads and risers will need repaired and or replaced Rear porch Repairs to some of the top railing on the right Complete replacement where its needed top and bottom rail and pickets All milled to match existing profile Gable crown Match crown to existing profile i have figured in for 15 feet of crown Scaffolding will be set up If we have.a shaper blade that matches this will lower the cost$400.00 Band board on rear porch matched to profile Left side gable crown Dutchman at peak Screened in parch 21 pieces ofT&G flooring on the left an right will be replaced The porch will need jacked up to access If the screened in portion of the porch needs to be removed this will bw a additional cost I'm hopeful that we do not disturb that and can free it up without that additional work. Rear kitchen small porch railing and column need repairs no replacement needed here Any structural repairs that are found will be addressed with you before any additional charges ( eves and floor joists are potentially areas that might need stabilization) All repairs and replacement will be primed with a high end oil primer and back primed All primed wood replaced or repaired will be painted to match with a high end latex paint Benjamin Moore aura or Sherman Williams top of the line All wood used will be mahogany Any Dutchman's will be bonded with a marine grade 2 part epoxy(west system) In addition to the overall cost each sill is $450,00 complete replacement And each sub sill is $400.00 All wood that will be replaced will be beyond repair We do our best to repair and save old growth wood where its possible We will do our best to keep the cost low let me know if you have any questions or concerns let me know Total cost(without the sill and subsills) $25,000.00 Subtotal $Qo0.o0 Total $25,000.00 Please make the check payable to: Preservation For Posterity Please print and or save this invoice for your records within 10 days of issued Payment dew upon completion of project and or stages u.vu 'Y AOL Mail-Updated list of extras Updated list of extras From: Mitchel Brown (preservationforthepeople@gmail,coln) To: jnwm50n@aolcorn Date: Thursday, September 14, 2023 at 06:21 PM EDT Repair under tin on eves return X2 $200.00 Replace metal flashing on return in eves $325.00 Removal and replacement of cornices above back door window $1200.00 Back porch (your main way in and out ) column replacement, structural repairs to floor joists replacement of T&G and lower skirt board $3,063.00 Scaffolding set up for bees. $240.00 Removal of screen porch $400.00 Structural repairs on right hand side of back porch 2ed floor$300.00 Demo of rear the $360.0 Structural repairs for side porch with materials$1,772.00 Total of extras I just wanted you to have this break down if you have any questions We are definitely past our original bid There will be a few more like the install and repair of screen porch, bees, trash gate post install , roof repair on the front dormer above the crown and any sill replacement. Well see you tomorrow morning ft would be helpful if we could get another payment as we have gone over the last deposit on just materials some time next week would be good. Thank you Mitchel Brown Preservation For Posterity MHIC 139572 301-992-8340 about:blank AOL Mai!-Re:Updated list of extras{updated 9-25-23) Re: Updated list of extras (updated 9-25-23) From: Mitchel Brown (preservationforthepeope@gmai(.com) To: jnwmson@aol,com Date: Monday, September 25, 2023 at 05:29 PM EDT Digging of porch post and downspout Cleaning of gutters and flushing out $440.00 Repair on eves return under tin Above screened in porch $100.00 Extra repairs to screen porch Column base replacement Skirt board repairs Install of a round around base of screened in porch Base repairs against wall and match trim install of screen in porch that we removed to access floor $1,700.00 Round one of bee removal and relocation $500.00 Front porch column repair to the round and making a new profile $300.00 Total extras + previous $7,860.00 Total $10,900.00 Thank you Mitchel Brown Preservation For Posterity MHIC 139572 301-992-8340 AOL Mail-Re:Updated list of extras(updated 10-2-23) Re; Updated list of extras (updated 10-2-23) From: Mitchel Brown (preservationforthepeople@gmail.cot�-l) To: jnwmson@aolcorn Date: Tuesday, October 3, 2023 at 06:04 AM EDT John Here is the final adjustments Sill replacement @3 $1350.00 Sub sill replacement @3 $1200.00 Casing repairs to 3ed floor @6 $750.00 Storm removal and install @3 $75.00 Gate post install gate repair and install with priming and painting $320.00 Bee area crown reinstalled epoxied the areas we cut out and sanded primed painted and removed scaffolding. $860.00 Porch roof painted with tar $3D0.Q0 Total , , _DO" Paid previous $10,900.00 Thank you Mitchel Brown Preservation For Posterity MHIC 139572 301-992-8340 iC> LII . I- 1. - 4I k a x rg t } 4 FM ' -&.$ • 13 (23 r Q } f � y i I. 1 oO rffac I. ,i: . s r ♦' ___ \+ �.J- 'rye t� i : � ;�',{��� e, e > 1 y�f'r erg a A t�` F :r,,*, '.__ _* ..4" ���- ._ `_i�-mss. .. _ _ �.r�y c� -�t •_ •tY r Y yppt� lE �p y ,• _ rfl'-i ?'� if #' 2T j1 :: I ; __ : 1 4 1: 5t r 4 fit^ i; r -rir ire}r i. c.1 _v 1 h iI f � e t �aa 1I : t it r �� • 4. __ -f> JtJp ( iAJJ ' } i ''!! J �� � �'• �tit �' "dY V i - "'.off -• �: �� ''I 1 .c. 4 I �> t I E�.+ is ♦ ... #-: Ir �t �t �M1/ad M�i� �� o-r,{,[+'r Y�.fL�` Y�� � u'�• f rf I� f• �fa i " r. •I t- L4k - s • 5 • 1t • I _____ _ I '{ ��_6.�_. F.. •V r , s � tip ,J- Ijj11 s l U I I 1 �`� r•a `� fat�'• 7 ,.' ! 1. i�,tty � ^ 'r r3 '; .s i ,�14 • y�(IIt i T419 f { [fit.: f 4n „ 4 j� I �iS'iL -�-LØ �ke 3 ___ - % - .. - - 1 . N � "r- S i' �� {4 � T>rl•-A�L"'�' 'e���y, '"" 'F� w ��r o r� r ��1 ti i i # �. s ! i 7 \, I ., ) f I :4 g Ir:p * r —- f — h 1i 411 I T �a s . `� •r' .•� .._ ask v ate' '- 4 , �' i "�—I _ 1J /511 I ___ L1ff ' I--iuiaji!iif1M1jIjfm - r - ____ ar _ Ln"ttiiii_IJJJJ1IIIIhIII_T TI _ _ — I ' 4jj c1:lvar€17�..,i. x s t �s r J : , . ; a'-��� ,�,�`'� 0 a .,,_&& ): ; .4 • r I „ � �I� � �� .tea�,_ r•.. rs�. 1e �s ,r -� --_ :...rye r - - '. 5 . S E -. ^1 31R • .49' JI _ l! S,-1 t � , J. A, • i. - - U - ,, U U ice i, - - .4 ti.. _ 3#e`-t`��,�' � s 1�'�x��_J+ •s �'It J i , ��j� y ''� �' g r ; ` l `\ �� , ff4 I tIr !+ti fit. 3 �}• T �� ' � ,�y; 1 }� !/ �% wfR r 7 f : :' :y L• o ` F x y ?k 4 p � + / may' y �` F f'r�' .,('.• � fir' r, n`. 1 _ __ CT - ______ - y J- t•1. / - —— 'Y a2" ne°h if • s t ti- t f'" Ir ç1ML r . 'i . _ _ _ I •• •% - • i1 __i Ii` � r wrrr"rec� ra rI LIH\IW e '��liae� r mar J ' Lr- _ •'—may —_ _ — _ ' " s � -- J. e; - .`^.}>`.. P� it , * `k r r � { !` '� 'N ` •4 ,iY L `I(� '_a�.. Fla. � •� r \ !�ld71j {r �. _(Ifs •' '�� 1r ��` r, r{; ]_ - ; . - - - I - - - 4 - -- - - - 1 •_ -- --- - -- - - - ___.II -; ,O a�ya`S�� c ( 1Y J xr ; , I; ti F �Y' fib ij �: f 1 - F r lfII 11 - _ ♦ . - t.- a "r yw R T .11 '-.t r+ ' tom'' s L • 44 .2,: , ' ' : FI I 1 nti *.b\ I , I I f tv •� I 1W �� -. 1. `f l 1 � • ...C*K ,� it • V s, fit.• a ?iivorrI1i1 âi1IflIni!IA1IiLI t * jJ [ jIIIi II I LiTT I . .,_ 1 1 - - - , ., ' . I (I - I ) / 1 YL 1. s - - J V • 1 1Y ` t�T4 ' W ih I 3 ±ate :—' ! Y/ /' j4 J : �.,; { &; 'fI / ` IIJ 1 rj i ./.r K rr . - t:- k �•�,:., �4k,, a �1 p 'aR tir v s F {4 ; e - ♦ t'T' a _ ' - !h'+ -Tom-^- --- . '- - -r Par ' 3 /lt( p/c4t 14/ta 1 7/0)1'- end DlvbW, 20�3 vi vJaS 1 n �r�J�CSS oti�- TT e ,•! 45•': r, r ,r # H i� r 441 ,. rl hi 1'" r�. a � 7K'•-'S :� i;:- Y tr i � C ar ' •a ��•� r � F • -hJr�.- � y S� � ,'_ trY; Yt r a i[ ` t�.:' 'c ';�•` c,." i --�-' a.G.• 1 ��" a+rte`- l}. �`. / ; / '���' ^' i �{. '• n •Ar PRESI ATkDN pi a e FOR iTERITY �' e � ~1y v b { iA seccl.ux .l w- 11 l;rya _=� � -! r 1 7 µ .s • r ,q - Y-Fyf, 'fit•` d�V-a k7 -k-- - 171 ,R- Y°'s ' ' f } - _ Wit• `' :_ � �-- ef ; - at T ic- T , T t - " V ijj ' J. ! ' .. f a' v s y� 15311/4 II I% ti __ ___ YT ii I r -.1 will 1 ,1 j ii TM - I w I J w 1 AL a � I k: a k __ : ,- • - < — 1 - - rf __ _ _ter Ii' -- - --• ---= - . _ -k -: !, \ �r { 1 t a Y I _ 2J -i. '�� •��•y y•n I. ., •b r , F R' ate~ !�$�•' ra t T,t y`r �'r rra _ K ' r 'c{' 1��a h '?s s•_# �5�. ?�' t s'§. 2. �._ l: ' w � i 'r ts', ``g��'� t� 1 � r St''f��ee t� :� — _.- - -h.. JAI" r•1' ,gyp - :' ;���ta�4 ; 7T;.�'• rl� t,-•. ^• 4� I . ' - ice'-T .. , 1 T_1 \': 1 I I NI "1 I I - "_ E•f •A r ` IL1 \ ' 4 -' A J 1 i - _ 1. T�r. 1:iT * 1 . L � 0 s'. x t - /ff - WI - �l: s j 1 4 t 1 1 >7f'V _ it `f ! v y +• • . + f tee' S : ' - , 4T' ' V , '�'. r -.,,:,.��/. /'f '� �. _. •fit, �, . `, --: ;. '�, �" a r �•.:+'{��r. I•.; f� .^� �" r �♦� lye i - = i _ t e I .r _ i/ 5 H - - L F i 6 1'. 1 � d �„ Y r UUL • _ lA; S Imo} _-r I F3_ e f y� e .s � � t i� f•y1'1 4. ,ppr t. — ,l!M Illy`. , \ '*f rf . - . t U I II II I + 4 f � _ 4E 9lr F' � -F,IIIIiiri { I - t / +`J'C ti i $ ! V ' ddI...- ri I I I I •i -. ' .: _ • • • • • • • • I 1kll1 I �;, rt! .ice` � 'k k.��. .• TI1 t /'' -. _ - �'MI- R titip1�l. �•` - i. ■ 6 .T'J t � i{ ' S. • I • • •• • •i .• • . •:i -. �__ -.. Yom. �J �`_ "`�'v_-w+Arn„�ti•4 ti ti 44 A / 1.l I ,. ..� 'fir E .. � •r•.a• ! -.a L • t rf r: •.Ir ID - 1111111 4` - e r ' r a "'�,'y�j\ I �rT v P + :r. rl ; ;'+ fr. ''+� '� - +'.• fir` \\ \\ \\ \\ ' ' T ' -— - b : .: Ir f,�• i � F S it r� jsTJc - - < �•#. Ijj1 1 I - 4: I I - 1 I I • -af� .. 4'� -- i _ _ v . - + ./ - `ifs• -lam - !. _ •,�'� l - f � - _ r +.( .._ --.�- •` �`�.- - f• s a , • AlA r - iHpr4 I �a : S . S' . f7• x\i .=.fir. . ( � 1 1 4* i I 4 ^Y7 f • • I ii �+`+�` ♦` ',may" �} a. y r J 99 s !f ��y�� �� Sa '*���kr•��Wsa ��' a-� a`�+:gs• fa I g s {Le r I` �_• 5����s x� s��' �� •��,p-c���r3` ���t�s�4'a "�S�. ' f '•$ veY/l y Tf r r*'`F,$ 44 ��. dl8�t ,;• � Rt9► �� fit � � d ,►..�. y +�'�`:. �.4,,,.s�\� �� F 1 X ' '','� r '� h^^.: , y a i F_y'+'jl ,t l+;a'f�} �+1 L�� 4a `714`��•+ 7 ___ I [ L i • r N -. I . ,r,, gigI : . � �n �1 / V I -•, 4 E � tom;,• ... " mow..0 • 'far t y.. _ }�' ' - _ _ v.,;�S 'yes-art'+fi t•I F�Ir t •� T �,:c.�— '`-•;4����`f�' 1� 1�Wks_ S i 'f���1� -�� : s .. p �i - e .:�� A`a°fir �,`•�► �"k�n' • 'y+�e rt F si' € it # Li x�Y , .. ...rl,l Jam[a ,tea f rI 1 t, r •iierf II IJ AF/ I . / A 'i1 / i / mil Ili, r f - ji/ uI9F I , .� `�, •+ qtr•,� ��-'. � _ 7• � ... -c � 1 I / / I I / — - - - 1I , gpAwIL •1 v�j, ,}! - � r �.lr � �� $� ''e� :off' hr ��P ~. ' ' It !� r L4. qi ' ' • • . : ' 401 �I�' _ '�- � ��f l ,,� yr, .'�"• r ii 41` • d ``°caaia ` 4 _r_ It , / L__I W \Aj ____ Ji I _ f41 '. I _____ } r ".}t i1H41` ' " 1h1�i :' .q' •1 rrrJr ! !! ! i -. __ I I _ I tII- ___ __ . i * • 1 ___ __ __I 1?J 1I ___ : x1 '/it r e 1 ` \- � tr t Y r_,, a.� \ \ .. !a l•�.�L to sr"rr I ! Ij1 r .�_ rT rl ♦f� Vim_ - �.�..�� fi r � .s !c 77� •j � ,1. ____ I __ __ .� S. lF` s � 4 . . - - -- -- - - / •;-- - -- I : ' v iy, ''jf+Js L" % *PLI\ \\ i3 rte^ eye 'ice _ �f f .t�11Ai{{1-'" �' � �� ��� �t:�'�°} k7F"-•,• � ��f! sr\�1 �1\ �>, er•yCf',f� __lyy'� A�`��� -'�. .'r �'`S„'� lY 41i � F •t�..�s. -r }�aw�4 s{'S r y. i "'rrti i1tF. -. ���• , � � 7� ^5 �. !�, �1) :K`�r'Q" � �_ � "�'r,"1 + - � S"wi•ezS�� �G �/Jav'�r�a4�.'= . fSIUF / F .+yA. pf�g'* I� .r}E'�gs'� ,yr +c'¢ ^C• �'�,�] �!>' a y . :.ry:' t•. i,�i � s- YIiTf'1 /, ``A'r {fir, "/ -d��,+7.t".�' �,d.�L�t:•E+ lv0 !i ! s"� �-,•f #1 .I�`�Is �ia.•r iy, '' 3 .'s +!• \S,y >` .e�7'i' , � +,,� 7 �FA�-..� \ '�y- � Lp yp,t q.sr}�y dg�� IR":�1�Si s•,� q�{r I�i ,s. " ' ��f$ �.��r' ♦. ��� � �_ �'� t; mfi��ig.�t rrf ° *iy.1 �z fit• N a r r ry + =as ` 6 3rh2. rpd!'J ' 11d •� �}Y. r 75 .fit yti₹: m♦ � F e r. 9• �e�.. �� r-�1►'"�{ `�,• flli ��1.� �'�ie •ida33 e+^o` 4' r fa• .r9 +'pr-t' {! ,�� ' ry !..'" �iA 1q '' .r d? - � a" +/' !.�� nB � �p�1��`�. 'v '".� � ' '����*�4. /��4_i; ,����1� � � �4�r �' �.��� Y ��S 4 i�+a � ♦► ,y- t r � fb? ' r Ly, + '}� 4 �'�`& '' ■ ,1 � n `F, Pr 9 v * ` �.ALi fit* Firis1 � �►' °1, 4► a �s � i v k r� ���i�, '4. �R v:�A2' Q i�' �.) '♦� 1,�' i1,' rh ; iif ►`s� . i_ ny &P`L" '4 a 19`r y` ,�' � 1,j��,ak ,r ,f ./ ,�� y t •r m3 ���� �� �r�•.w.. �'sT 'X 'p r ,u� # a -� �7'R}.� i �' +e '� ft 6 S$�•4 E, �U mil- .�i�'Jf '��fi` - s { r' : i � y�,.r.',�`. i'�OA k. . ��k��d4 �y�I�7f1��F� a �,. r�1}�� •M aan3 � �� ..�3 q j,*��rly gal �.-+ t_ z ��+�'. 'l:.s 4i," 17 +`'a� y;, rs fr�K7�: . j ;ei} ate,♦ ' �. ! (�;. Ft� r$ 'C1i -4,`^.. f�'` - .. �. ri���'� �*. '�X:.k ��a�-, S: ' +.L +�j}q¢y1.�j � t•�v�•j'A�� �y '' ��' �,(v•. i !�� • �: � *c3"'�$$ w,�"'y�,. y��.. R C i I'ti �0 °� T .�"4 4 ♦ X31 \ � n ya T.ca'. 7wjs vn .eK♦ i n a b �"d+5,' s � $a��h;r�' s env_ y � E:\� t S �'�Z`'' �.�2�- S �+ �,vc;,F h �k} 'E�3�� �'i!..��/��.+�., 3+�e � "+ry!'��� ��S ief%�'A�/��: IF !�'�� �� •� '.,L:f� ��fl,� ����,. � � � _ -- !.�''4 - HVai4 c/Ill fatf 3 3rd FW- -:rorsf W! Jill / I i - r, f ,°" � �I'i�'� [(t Mfr iZ�• /" E,"� �_ •. ,_.., �� ..' r xti aye °� ��. u' ; +� .•�� 5F f� ! [ y ra tr yf�.�,a. �,yt rFe•. 1 3 -+, tip 4: � +,• �° �� �� "�'ir'��w. ��,-v��rt�' '�`N�.�ti3a`,:� �y���riy,�_ f - 'r' - f�-�'t -'wt *t. -_ � • f/t+r �'��'y♦�x��'�° � T'F ' C •yI �� !t` k Y \�� i'1• {sF'''f y.7. '�. "+ •n, _ may* I tit-- ' ' i � Y t r Ar Jr r. y / elf ;, +' . • •�� t_ !t r�'r'ta� '' �� f� 1`j3�?�' L'ir3� � � J. 2 ji�' � .dh?i'��'����{}, 7,T 'r- '�:'�1q�,. � �• r Sp Sr. j { , '�. a• d.-gyp+_ 4 'r+ .. fi y r ad,,'{.{�• t ��r ,t ''r'�ijV �'�r 3y+S .� �jn.+o .ts+ba"•+ y ",;�"� ► " ��t' ni �Yy�� rw/-Y ?' Apr - rY ¢ n �r;�' vlv' v �� �1'- ''Ake._� N `•S 4 s! tte: y°p2.F +w`{�: a, . l � •i iG ate\ �+ }A kt 3',k-.may, a YR1 r {1 +_.. SATs g TEA 6r r �g 4 ____ YAè s T 1 P Ji A+ y y_ �.;r �j y r✓E� A 1 � � lf 11 fY]9 ' r Lt I TIj- AF ' 4 a? ► t '' � � '-���_ ���w/ ...• ���ii1((1 S Wit,v'i'a�. '� ' . . I .. . . _ I : I 1IJ ■err■ 111 I ____ _ 4 1 r. J1 __ X - 4 - - -:mss.--v:r,= '__- .. . I. I I N I __ I I ' ! 1h < - 1 1 __ : - . i . . . r• - r �, agar. i4Wi TI !I! Lr I - ff:_ -- -- I . kt I c \ 'y ___ 3 _k ; 'w I } ;4fA i fi )d !\ II Li- /_ij 1L : ii —. • { ° - --- =.=--- -- - :.. � 4t_,\\ / I • Il.- 1k- - 1 _ - l j ! I 1 1 J rte' -r 1ff/ _ W 'L - f �P� t I - , 1N V_ . __ It . - -.. .,. - ____ . 111 I tiLll1U1IllllliuIh1 ,r- 4 ♦ • l , +1, f f+f++++ +++- r ♦ ! �� 1� fff ++� ,+i �++ , rfr ♦ + ! fy I+++ #+flff� +f�+,�+t++rt ♦ ! ! ! t ,, +f flf 1. + ,++r: ♦ ♦ ! t + tff ffl+++ + + ++i+ ______________ ♦ ! r � rR �r1 ff ++f ffPhil+• 44 ++ ++i + ________________________ ♦ ! ! 1 *41* + fff II , ______1111111 Ir --, : T' '; __ _ __ F ii117 JJ/1)P \ *k _ 1 / !/Ai 9I e r ti�v -=: i, __ r ; t ur .. _ l f T -, t r + e- i i`1 1 I; 1 - - --- / ________ /1. �r f K 1 a j . i L I I _____ \ _ c , ' d'. � 1C �_� ', � Tti'►€' �� 'Yep"Pk� .� .— �y I LfI 44 = ___ dl �4 \.\ - I'. " r+v � f S'q Sy.'y\�t �y :: as �� .I .LY o�� ,sky J Z 00 O O O z 0 0 u_I O O l�D lD Z O v X = U w O 0 O O O 0 o o O o p O O O O o 0 o O O C 0 00 0 0 0 00 0 0 O O O - a 0 NJ 0 00 Ln 0 00 N C U a Z C O 00 O 00 0 00 M - 00 N C w Ln Ln N: N Ol E G O y/? y!} N J z O no } U w •V O O O O O O O O O O O O LO 000 0 O O Lf1 0 O 00 . CN-0 00 0 00 0 Ln 0 co t/} t!T O °- z o �D 0 00 0 00 m L(1 L(1 I� M Cr tR o N t/} V) t/} Ln J a O Q w Q U a y a a a U U J J 7 U a 0 (6 4 a a a ) 0 O C C C O a a a 7 C C� a (6 (6 - J C ,- O E E 3 Q w o v o o O • M U a a a a Q o E 6 ++ }I CC 07 �--' a a D 4 •- G) t C M La E a ao 00 LU a M M C ao C G) Q 4 4 a � \ \ vai a a C C O w 7 7 Ln M C U in w L.(1 O — i1 i1 — E O O Q 0) f0 X l0 Q Q ++ Q Z w c N M a N C y H L C C C s N a > > > C C a) C Li G) z Y v m 2 >O v i n N 4t O E f0 J i E i a a O a Ua- xk xk N) N) u u 0 a O - O a (o M O L i f0 0 U C O > ? > ? > > N - U + y y y O a a a a a a a Q Q Q Q Q Q E O O O O O O N m C d d d d d dvi E O O O O O O Cfl z a C C C C C C O C o 0 0 0 0 0 V f6 c C C La 0) J >- E 55 C ° ° ° C O a s a a a a f I— U OU d d d D_ D_ d V 4 o - 00 00 O en za V Ci C O a ' = 00 fl U U C J a O 00 CO N N M O N O 7 > C M N M 00 00000 �^ U > .� - ---LO t xt zt zt zt 0- 00 M M M M C 0 0 0 0 0 ° Q z z c n N O 00 M 0 G N N -- V K J a E N O 00 00 C) O ? m U 0 d > N Washington County HISTORIC DISTRICT COMMISSION MEMORANDUM To: Washington County Historic District Commission From: Meghan Jenkins, GISP, GIS Coordinator- Historic District Commission Staff Date: February 27, 2024 Subj: Residential Demolition Permit/, 2024-00586 Staff Report and Analysis Property Owner: WASH CO COMMISSIONERS BOARD OF, Applicant: Eric Miklosovich Location: 1244 FREDERICK Street Tax Account ID: 10019192 Map/G rid/Parcel/Lot: 0049/0024/0015/ Legal Description: LOT60X315.47 AVG .1244 FREDERICK ST Zoning: Residential, Suburban Rural Village: Ravenswood Heights (MHT) Historic Rural Village Project Description: Demolition of 1,288 sq. ft. dwelling and any associated outbuildings, fill in basement, remove driveway pavement and sidewalks Applicable Law and Review Criteria: The Historic District Commission shall review demolition permits using the Review Procedures adopted by the Board of County Commissioners as amended on July 17, 1990. "The policy does not provide for approval or disapproval of the demolition permit.These permits are issued solely on the basis of meeting technical requirements of applicable code." The review criteria for demolition permit is the same as the evaluation criteria in the Washington County Design Guidelines for Historic Structures. 1.The application shall be approved by the HDC if it is consistent with the following criteria: A.The proposal does not substantially alter the exterior features of the structure. B.The proposal is compatible in character and nature with the historical, cultural, architectural, or archeological features of the site, structure, or district and would not be detrimental to achievement of the purposes of Article 20 of the County Zoning Ordinance. C.The proposal would enhance or aid in the protection, preservation and public or private utilization of the site or structure, in a manner compatible with its historical, archeological, architectural, or cultural value. D.The proposal is necessary so that unsafe conditions or health hazards are remedied. E.The Secretary of the Interior's Standards for Rehabilitation and Guidelines for Rehabilitating Historic 747 Northern Avenue!Hagerstown,MD 21742-2723 1 P:240.313.24301 F-240.313.2431 I Hearing Impaired:7-1-1 WWW.WASHCO-MD.NET Washington County HISTORIC DISTRICT COMMISSION Buildings and subsequent revisions are to be used as guidance only and are not to be considered mandatory. 2. In reviewing the plans for any such construction or change,the HDC shall give consideration to and not disapprove an application except with respect to the factors specified below. A.The historic or architectural value and significance of the site or structure and its relationship to the historic or architectural value and significance of the surrounding area. B.The relationship of the exterior architectural features of the structure to the remainder of the structure and to the surrounding area. C.The general compatibility of exterior design, scale, proportion, arrangement,texture, and materials proposed to be used. D.Any other factors, including aesthetic factors,that the Commission deems to be pertinent. 3.The HDC shall be strict in its judgment of plans for those structures, sites, or districts deemed to be valuable according to studies performed for districts of historic or architectural value.The HDC shall be lenient in its judgment of plans involving new construction, unless such plans would seriously impair the historic or architectural value of surrounding structures. Staff Report: The structure is listed on the Maryland Inventory of Historic Properties as part of the Ravenswood Heights Historic District (WA-I-887) which was surveyed as part of the Southern Boulevard Phase 1 documentation in 2011. Ravenswood was marked for NR eligibility by both the preparer and MHT for Criteria A for its association with the Hagerstown (electric) Railway and as an example of a 20th Century suburban development. It was also noted that Criteria C was applicable for the bungalow and Colonial Revival style houses within in it. The documentation did not result in a National Register district being created nor is the Ravenswood Heights area a Historic District Commission review area for exteriors. The structure of 1244 Frederick Street sits along the east side of Frederick Street and the SE quadrant of the traffic circle which is the current terminus of Southern Boulevard. The main house has some visibility from Frederick St. which is largely obscured by trees. During the pre-construction of Southern Boulevard Phase 1, this structure and its property were acquired by the County. It was not demolished at that time nor can access to Frederick Street be provided due to the construction of Phase I removing viable access to the home.A revised entrance was not permitted due to access spacing requirements and the lack of right of way from adjacent owners. It has therefore been vacant for 12+years. The structure is described as "Brick bungalow with gabled dormer. Flemish bond brickwork at front. Two bays with three-part front window with 4 vertical panes over 1. Art deco-influenced entrance with sidelights and transom. Square porch posts on brick piers. Ca. 1925." (MIHP Ravenswood WA-I-887)The rear of the structure has a one-story frame addition. There are a few outbuildings of cinderblock and frame construction including a garage. The interior of the structure appears largely intact with original moldings, doors, paneling, bannisters, flooring, radiators and a built-in. An Asbestos, Lead Based Paint, and Regulated Materials Assessment was conducted in January of 2024 and results were provided which indicate the presence of some materials which require a contractor licensed to remove. Asbestos was found in some insulation materials and caulking while Lead Paint was found in mostly the exterior of the main building and the outbuildings. The building also appears to have some water damage due to a roof failure and/or unsecured windows. The County intends to plant trees over a portion of the property not needed for right of way. 747 Northern Avenue i Hagerstown,MD 21742-2723 1 P:240.313.24301 F240.313.2431 , Hearing Impaired:7-1-1 WWW.WASHCO-MD.NET Washington County HISTORIC DISTRICT COMMISSION Staff Analysis: While there are currently no final plans for Southern Boulevard Phase 2, this property falls into the approximately 150' right of way seen previously in Phase 1's construction. As Phase 2 (by others) moves forward in the drafting of plans, the demolition of this building is unlikely to be avoidable to meet necessary site distance and design components. There is no viable access to the property to have continued use. The property has had several reports for vagrancy which have been addressed by ensuring the building envelope is locked at ground levels, however,they still occur causing concerns for property owner liabilities. The removal of this building, due to its existing minimal visibility, will have little impact to the surrounding landscape. Staff Recommendation: Recommend support of this demolition permit (2024-00586)for 1244 Frederick Street for the reasons stated in the staff analysis with the following additional conditions: 1. The County has not bid the services for demolition of the property yet. It is recommended that the bid stipulate that all salvageable materials including exterior bricks, moldings, windows, doors, paneling, radiators and any other materials the contractor deems salvageable be removed from the property prior to the remainder being demolished. A contractor qualified to handle selective demolition and dispense of the materials to a proper source for their reuse should be included in the language as well. This should be a standard policy for the County moving forward for all structures but especially those older than 50 years. 2. Staff also recommends that there be a thorough assessment of the County's buildings which have been/will be acquired to ensure that they are properly secured at all times and utilize the mothballing methods detailed by the National Park Service Preservation Brief#31— Mothballing of Historical Buildings. This is especially the case for buildings older than 50 years. 3. Staff also recommends that Ravenswood Heights documentation be revisited for potential National Register nomination at a later date with the Historic District Commission, Maryland Historical Trust and affected property owners. Respectfully Submitted, 9Ea Meghan Jenkins, GISP Historic District Commission Staff Attachments: • Photos provided by Applicant • Permit Submission Packet • Asbestos, Lead Based Paint, and Regulated Materials Assessment 747 Northern Avenue I Hagerstown,MD 21742-2723 1 P:240.313.24301 F:240.313.2431 I Hearing Impaired:7-1-1 WWW.WASHCO-MD.NET -. /'""a d� v- �f''�r �' P�•� c-' � �`r`-,a°r l/t# s'�►•� s• �, ia•'. �_.- "an A� `•'"�°° ��f"u,,�*�,:€iv.. y�� " 0L�•iF ttv��A•a°iat�19!`9h �,�a•�a\ �F ,.�•11 I�11 Illl�d � r �J, —II� 6R1�!, _ _ �Y II ' 1H / y Ef FMc..ti�� 97m++,a.G•�� \ - I 1 aa a..,�. �kk. � J a�, � aM. v �/ ��*� �a �S ry 4 sa +l���jjqq���� r rri za � g� YCr�I. - - - t 1 1 aIY a�l✓��/� 4k/��ttf t� ' L.��.{��p`4t K ,! _ �^� .� I " f J�qey �py�� t2�' ! 4 h. `' �M. i,'r�+'� .•ii�'r�x a u, 3�'!� ly. l ��, f V z ��-� ,;i _ _ tr ky *�rc �� � iPy�! li —� t' -!-I/',�$ � �°;� ter;-� , '�� � -l`• � .,��- n� � -�•� (�pppyyf��a" �®`''f0M.� i /,{ w � sue,A •3.r 1�`1, t t -,\ I _11 I , / :���� G- ! CS/��f � 4 ;8r'ySs tf•Y"+. f �I p .sip 1 Sti :_ 1 .T.'A aV. V\... .,"4..•8 4�s �y '�`J+'Y� i^�'d' �,! fJl1'•p111 �`� �.n a} 1��`IKr+#t n.�� �`� /r �i,Y a41y. s�y_, t S�,P � ��r B/d �s,�p amlJ ! ngtda� s•` �_nr`�} &w. � i� �3 ..Il ��i l�,�ICI `�-�•I%�'/.a1!' � r " ea i 'a�'�. ek',- f.z r_✓ })' 1� .��� s r' i s- a Y- . r* )3' .,4L.� a A.y "vr�� `" �.° G e�T,.,�� at .j IL ✓, .1 .,_ /— f'-�F- �* g � �4,' ri.l�''e e, P r w�JEOAI +$ d�r� � 4 �•m+'�i� i ai r k y EEM1� r "' r r I !F ,• •�'. 3:f^/��/1•..�.'�p���ti�Its '.k•yP 1 ,_' ;_� ��aP'�ht'J�N�, t t��.". � f f �; R• s r� - i ( " Mall "`" ie� g � ' <a•`� 5� @p �Y 4' � �A td � ��}� � "� , a�I�w,�A��4,�`®9:MId � �Ik AL Fd•s -- + ySF �,*n 3+'t ..•�! 'y, C'}A ° :fy�i fdlI,�s �yRR••�Yri'•�—� �"'�°��'q�• Wr d>:@"� ,�I. .3et �4 t1R-, �. ,�g (ej• jI r � �y�� .p ate! e � » a+• ,, �{ n, I '� ,�, ; �''rr bv'+aF ��j �7,� e tlti1 :1:4 .� p # 1 J 9dNF7 {t 4. ,�►��'i..�Slq'a% .../, �ia..a� .r_4�<.,:a�'�'®i.�.® �'G�bl� .fi a{�+,'a� toee�J3�i3.� • , '' - .7 . .� � � . ��.�! � t��r. .. s, l„� �,�'r\\`�I� sfi'i..•�@j�¢ t� �S�� ter. r .= �.✓�A.►'�ews. Gam% J``�-..spew¢�- - •� �= � -'� v� .., � f a _.,,rtat�' � ii�.'�`6i6f�"-- c.�rl l+,+ u r •+ F, h( 4 v _ Z� �1R.ga�'`t a. �'Y./ `��r/k�."� ��S'J►t9'� -�'�' �I ��,. YL r P,; o �'++ �� r �A t,.. r S J�`� SSG`�y�`"'ti�wi"��lfif�+��awt+u.���`'���03'�.►"�� Y t •'' e it ,.M L ���h�(�� r, 4 I I {1 9 ri I Il Rh + r a�. . <a �cesrg,L2o y a: x,✓ G b h f IPy'�ff .,� b r � C - f � - _ /�`9E""x ' A " Pr it s '^r�2 X K, j : !\S:: I � �' + a CI -- - _— f rs kk''3 e ,�\E S�k'tj�•q�a� � J��q✓ �� 1+V7 ev �) _ �_ 1 1 I" 1 ������y i �. '.�°. � 4 ��a°9��4 •dy ',�`' �i6 ap avei I �1 :r A�� I}� tit + � �r � _+ ,:F-. •4+Z+ n P I y xr . �1. �6✓f? 3s��,� .wry � w.. at + � �VV +� { � �, t - ( '� f l* _ �f .. ��g�A^'t�t 6 s�.£iTy(,,.•4„�,. r�.,it ,° :�l , ", I�� �7;" 'Lam-.. �, �. `iL M 'r+ � ;� r% ©e 67� <o�9�y M�/� '�'f �' �; r" "' 0i e�� I 1r ;,Y a�e: t"� 4 I`_ ,x .-• ,t �,,, +• aS�"''" �i t �a®� 'i s ¢ '�, 4 " .,ReEi''a - I .f11� ^'J� �`i�',� •�. V- '� S '.n) £moo J T 1 Y by - ` � p } rJ, 1�I � n} v�, 1i i ,•'4 f'r 4(, r c £ Ii I P! t r G,5'- - � tin s �•t '`' r!' E..,, _ a si'�x�G ao. ��d tr I ! 1 fl � t i;C des:• d9���r�`� �i T'�� $ ' &' !$A�"du"•' °° � i.S�"' `ah�ey8�.jJf.tdf. ,rj'l, n {@ ,;�•ml k a �.�.il +{?tQai ao •A. ". n:1Y } Ir �� ix �• 4�rt'I � � 4 .ri .��. bryf+e�w a '. �„� - - , yt f .. ° E9� l-.� Tf .v[y'A,+/ l ,. I 1/' g _ - a \ ra +'Ill '�' � - `. t. • .?e_ ✓ tom ►a yda �� ;:+�--`�#aJ ?'ul r��� ,+'i ':!�I� �tL.Y:�.9�' .- esr. .. i .....�k... �...- i�,. v c P�.� � _ `1�.;���....-•t, - r� ".alp \� I,j� 'yr ? � e NMMII __ __ ,� `.t,�+� \dam\�+\���\ \ '.� '_�a��_�i■�� .� - ��r�►fie' i I, �� v`�.� __ - : _ __ 1tid.'it _ __ - - -_ Xi eI __ '� 3111� � ■�■S■ 1 ��r■■■.■■�■s 'tea r s - •-� - .fPr e?� 3y i y�A ��ti•.�� �. ,��c.�. - ` y ;.r✓ a Fyn, r �7► 9' ski;`$� i�. '�" ���y/.Iac�L��° I� bt�fAr S rr� �X..:! k:' 4J � ^= �".,� 's a �.� �4►., � - �� ��� s:` Y f•� r ..�. '�,�� .� 4 rii iJ i 4 hut rTJ _______ q I d. h t• � ,r � _ •�3� � -xc � _ ��r"�� lay��rs� g�1A�or�1 � �-i I I 1 'Ik �� �� ,fie�.,: J � . t� z 7 41I 1?Ii=I111IIIJ 1111111 t ; "ii 1111111 1111111 ''Iu IIIUN' ' ,1 'I `.�, .. +s\ ?r 11 .'.44 �`I � 1'.!'���'a.�„ "• :asap :,+.t�.., �K/� f _ ,�`,''�" :3 �s— 'w _ d1!�,l�F�. p' � 4 ! �,Ai C .jlY,7 `t .,.'� ,!'.r, •. 'i �'�- �1 �n��a ^�..a ea�'•" i Pc�•`f+! mil'._ �r M1�- b° � a�,�,i�� - r f r � � '' -• tl �.� +Sid����.a•-�.��;1� 1�_, �, .' _;+`+,�. .i �, / _ F-. � t•�'��� I -,p4 • II' II gyp.. p:Q,r� •�, 4.#! ^ 2• '$:.�. ��' °ititi� �-.! —':� !IIi \ ,� .'h.. ®I ���1- 1.,:w •. , '`� 'y> �ri�.. ��' i' ,✓-( {/'� a .�1 ire ,��i _ _ .- ►•-�h, -ttr,...er�• .�s�-' __� I� l� �� '.�" � 1 ��� � \ i ►�� �� �:,� mss' �[ �i�I � �• per_ I N-a IIrnpIIIlIIIIII �i�Yom`; )' d. fir - /, :s_`-AyY ,e>b�'r fir.-.a1�.� �:. L•`z � �>�L.' / AI y� ,> i. e'•" ' '��I�r•t, e'Sr��,r 1 ®{,t. { da.Ii. ' MkAm`>s iti .r y i im 17�'���r3 re + 9. •C�."1.a a RO ate .. �� �i-iw'v�f�� .>ai�' :4 "��i�:a �g �"�1 r�(t'���� '�,��„ �s 1 v�►�Yg.'��' .: .�\. r'�`,yr 11 „�S'�i5 .a'.i,9 �Ytq':;�x'� '. . t�-°'s�. 1�vi i.1.`.. -�' t _ rn¢" �5P'Q!.'' t, R'�x��^�. ��rv�d1 � _-w 4f,y. •.;r y� ;E� �' v t als'"P°`'.V i. q\�hFY 4' •-+ # '� ! t r *�P�a �- '—�...\r. 1�� `r ..a L♦ a.; u a'j�j',� '7 r.. ,r �- 3 • .r4.R,1 �3�-,�p�v' F�.I, e '�� pt �in t' yo.. .r�r�`�-o ►. i,S g�.'��'i�� L 1, 'i" 1 i��p___� _. .'z a �s... � �vi."�1►y�'; w y - � �'�� d�""x_a.. �f�a � a a � •!' F. -�� n�,'A1t�.�$,yy,rS•��-T`� / -- -. �� �i iP���'.. �� �w J �j �;('�"'CC 4'4b�'�1 g'{ `�,!9`��� � •. �r�,�4r���."1'.�J/ � �: — _ ai �.�::� �. � rxaA � ,�` h,,('rr9� �•. r hires '�7�"�,� { ( 1 ��� , ..• r� � ;' I �� 99993 v . I, I - - •c - - - - : 2 -- -- �1--.- ø*, ,s �+f!�1 , �, ��� �}4��tc � ry��a....�°ayx >x�� �2. 'Fss.��dl't7y�+W�`� ��♦�..r ",{zl� ��^�}1t r'yF FY.'�����' ;p p��� J r"�- �.. �y� �. �♦ � �rR +;���n��;, ��1���'.. 1 �F i �.._ f���t"''41ei_ .� •v --,�'�'�so �3�'��� � wt �,` ,' � rr✓' r i�,.F�,��, ,.,a�rrfi��.F'/K w����; a�� ,yw _ n� a � ..� � rr, � `' - ,"C •� re '-' r„n r��,'M'r Ya` i?I �'"k ; z r -3d �",� ' i,� " '� -• r��- �msf�''≤".�.-er -- ��,: r�,,�,,.,c..r.o -r r r is�`-� �{}d"�.,�' !� ,.�.• J y r K r 4 1F ! ! 4I iir 1111 M-1 fK✓�1� r r r Ir 5 3t gft:$!!1II � � 5 iillr •t ' r 1 .r. _+icy.� _�_..,,.r A '� '�+fi+ _� y A"#}'�'F��s• r�r1R1 � r rs '1 r+ ♦-oa'f+"+ °14, A i' .�,� ix �'ya.- 4 E its f. r� r a ^' - .�' � 4.�?�.,.. �<-•�.4�► ,!� �j.,ti'rtr'>; sa 'fie•. d'd�lz'�.`,.`"3z n� � f `_ -!=���'" g,„�; ,^ Pri ' " r `.tea's a is;i.�. -,�"' -. .. f r y � r 'r+ !'LF �Gy ✓, /f� d .se .. �. �.- � �Y f•N�.i�an3+6�R"„'S.du 4�i8+m ��� Yam-'?1..�. _ y�f''tl'"`, �m�t c-m' $� � o o agt yy �_► �rvA' ri `@B�3'5 a-�•• i� 1_p/- 411111K�fib a \ o dliii IN sI •a `..fir be\ 1 I ' - � —�-��— �I I______ Ua l �•�� • a.+ �� �c7sa► - "� < Sytj i �)t t f !�➢ �r�,i � •8' tier >',jjz,i. 1 f t / a '�f_� , �" a6a� "tip $► i v x a3 1 '� ` r(fdtr���s�a• �I.�a �11 E� ��,�� �....-fit t _ �i -•t, 4- �j IF � r 3 �qq� �' i��; � q�,.f, yt' •,L y F` w,.�k g Q 11.T,,��yy "'i ,(9 y�4�c - - - - ,I,It i '- 'a. 1. �' 4 , Ip i - 7 / r r 7/ 3 9' tsas�ti� i� r 4r^• ft _____ :>y: ;: t* i:ce ________ - 4 `� -� '�` � •ti's• I � ^ NSA ar/mss ®mat i , ka tlE ��i �� ♦ 'said ro < 1 6 .: �_ 4ae.�♦ o��;� -c.vX"�^ h. �t��Glr'"$ '� :- �� 1 .F��� � `` s � �:,�y+. �5�i•6�'- m4tt��m"— �.. ,.�.;,s!.4rA r"R '�^PR • �- sue' _ ti .t� e,� i c P 1 4 ''f� _:2v-.. \, +� ���,'"f�►•'$.x�..lPs�„iJia*14st �'r �'''l4. _ 1 `� -���' 1 •'i f r'� -4 �' .j, d e /4i�1� �M�:�f/•'�',j�{��• �S+,1 M$��s�-'�sAS'. '@/�� �V6p� ,. � ��rI' � l s „ 1�;, y,e�a�,y. '?n ' f✓ ',r yr �r�fe. I� .. �g ��.1' � d1 Ve�1 '1i x �Fa , 11 �.'� r dye'>/C' • e, l7f�iS'�f ` 1 i' � 9! < 3r •t����F'�ID'�jl�ti�aR ti T -+1 .-..� +s-r T,v' g mid. ,i. / i,.r,. 1 C h s J1. 1� i i •� ���A�� < '�a`>a'a�s'a'.;?�'��A.�{ �� .- .+`�""° �a � '•����� i y i I ,�ycx��y ♦1 d dAr ltia' � � vev � i �� 3N9ii �♦ i i »dV �I+°,L 19 v.' r aU„'4T�' �, caL i�. 1 ��i4 S e, 'Ca"ap`. �`'(`r!'o, _ 1 z�x 'n� ti r /� 4IV �tR i'1.�f vkpxa da. rA h`" w it t�T. � �� 5u ,iar � r,. \�'d' i �'��i►�t� � a p �:.,,A"'s' fS i L��:� t t _ tl 9{ JiIIIiIt y`, ' d : l*: I, I : �\r B / di 'f ett ♦7r {{ ,� ■, 1. , a-:_ �. �,. �rn- u 1 d,%li.1P�!'��� ti t� !"i4 iI 649�Amr I� �i•-"+ate :«, 7u \. . ?� ��P'%P+S�! r. �,V1 3'��i ' • r�,[4� i � lF �-s� ,', S. � � gl e6 ✓.�1 yy� �gai a^� 9 `����� � �r t �,� �'1 S i� !� .� �� v,��� � ., t�! ��,� � si.•. ��'� �i r / ;\ i ? ��1�� ��',arl'/��<�� 1 +♦ •P�'�h �97 /.. ' ;hs � �`� ,�.j \•�.: a .1',i 1+ �F ` ' 1, �� Y` ,�° 01` � _ m, • �`}��.�� ,� A'ter; it �'� e ® {� 1 � �` aK'!`9��►-� 'ds,Y7, jd� 1 t `1P�' �� �'j/ 4>���}{ l i i I j i tt n I• a y nr is�t.=s,w,��>� '*.�1• r I��r4.k .��,�. y,Ni�aN 1 �'J� �I� I • i� I{�1�c^ � •,r �. IA t` 4 �r a � e.�9> \`'` "l v1 ��ff''. �� �„>.. ',iT' li iS�le 'o: a�a'•r r� J j�/�j I -t•' 7 `r 'r �;�'�pi�'•a. �A"�S �t�r��� � ��' � a"7i spa'.. .;�� �� r +' ..�`� � �\`i'°!1; N •� ���Y��_::r e .` 'I � t^�+{ ° r !. Y s" s 1 Via° <"i 's 4 �'�\�� -rs . ' + r - ;��% � •,��t�',�s . � r,, �{,(4 ,r/ - - � '���. �y�►�,�'R� .. � 3 �V�.+�m jg�jlj� - �D� ', � T'� ,�. d. r�>•t, ! -4-i - mow Yi it�i �� je+F '� }. ra\ �`I�'sr,° S�'r W��,�i �'•�,�,�r�, � �tyL1dY$r d ' If I "Q i ° . ";s, \. - �a 0. �� A �i 4•S ��iV� , j, V{{ � , Y �� .k �dlq 1 I 6Ral i •\ ,� .l� ' R l YY, f. y '�1q�1f0' it i i �iir;� as �� �� F�j{�,✓� .rA�"�,' s'�" ti� � „ R ,� y� `USX � a 1 A� 1 � er •r �,^.r xr:r n0 4,�f�, .y,F'3. t '., , .,�. �:�,+.ti •,�„�Yi'tll �F p�� ry� r. f t �� i� ,.'a/s ...,. ..-,�d � ... :4;^_,._ _ �� �Pi4AA..a e,���U�t►el/Nl'i _'�I? `.. \•. _ ��,:M'L�S,.�'i i.'3. 11., t�'2�.��....�. .. .,. b - l -��+_ iiII _ I __ 1 F+f2..v, 0 i t U''glr ��i. 1 1 I ' I ,+4�o a r"�`'�'� � ��� I 4 J a I, . I - : ffV I,r & j _± ' T'T ' : . : . ' \\ ; - __ ___ _ _ - } IA i 11 11 1 " I,1 1 1 n r£ i I a i Y I i i I _ 4fr4 J <: I. ,I r a 4 I I I. 1 : . I o6$ç4 /a r 1/ V ! / ,; 1 2b 4 a I i+ f 3 I {•: A " " I , 1 I� C ,,fuI1 ( 4. 1 r I ' A. ______ 1/ /' /'/ / \ r II I ___ ___ __ I I �i pp fc —tom Mj�A �. �,3t s :�',' 7s of f �e _____ „�. ✓ .. j l :. sue. may= a�” -',� -- .. CI r. 1 ` , y 1 ' 1 � // 'Ii" - r tz zII s ,; J •• r may--•= _ J., Y .•t t 1 Y�.� 1 f ' I 4 ii - Q' -- '•; f 8 • to it . f,-.- ( 3 � 1 iF iij E r 7 -- a i y a 1 ________ Al / 9.s `y s :LK J Rt ----mac i •1 • ; V 11 it pt Norman Creek Environmental, LLC 416 Katherine Avenue Baltimore, Maryland 21221 Norman Creek 443-690-8659 Environmental January 26, 2024 Ms.Jessica Klinefelter Montgomery Wallace 10150 York Road Hunt Valley, MD 21030 Letter Report: Asbestos, Lead Based Paint,and Regulated Materials Assessment, 1244 Frederick Street, Hagerstown, MD; Project No. 231228-4 Dear Ms. Klinefelter, Norman Creek Environmental (NCE) was retained by Wallace Montgomery to perform an asbestos, lead based paint, and regulated materials inspection of the above referenced site to include: • Asbestos Containing Materials (ACM), • Lead-Based Paint • Other Regulated Materials, and The Site is a residential building with two floors above grade and a below grade basement. The structure is approximately 1288 square feet above grade and was constructed in 1935, according to State Department of Assessment and Taxation records. The purpose of this inspection was to identify ACM, lead-based paint and other regulated materials at the above listed property. This inspection included the entire building. No access limitations were determined at the time of the assessment. Asbestos Containing Materials William Montley (MDE Accreditation #230003591) conducted the asbestos inspection and sampling at the Site. The purpose of this inspection was to identify asbestos containing materials (ACM) that may be regulated by NESHAP / Maryland during renovation or demolition activities. Regulated ACM (RACM) must be removed by a Maryland Licensed Asbestos Contractor in accordance with COMAR 26.11.21, if the RACM will be impacted by renovation or demolition activities. 1 Norman Creek Environmental A total of 49 samples were collected and shipped January 11, 2024,via UPS to SanAir Technologies for analysis using polarized light microscopy (PLM). A total of 76 PLM analyses were completed due to material layering. Bulk Asbestos Sampling Data, Quantification Data, and Laboratory analysis reports and chain of custody forms are attached to this report. Sampling and analysis identified the following materials as ACM: Asbestos Containing Thermal System Insulation (RACM) • TSI Pipe Insulation and Fitting Insulation (35-65% Chrysotile) • Flue Mud at Chimney Brick (25% Chrysotile) Asbestos Containing Surfacing Materials (RACM) • None Misc. Friable*Asbestos Containing Material (RACM) • None Non-Friable ACM (may become RACM during renovation or demolition) • Exterior Building Caulk (3% Chrysotile) Refer to attached data sheet for approximate quantities of identified asbestos. The asbestos containing pipe and pipe fitting insulation and the flue mud is considered a RACM and is required to be removed by a Maryland Licensed Asbestos Contractor in accordance with COMAR 26.11.21. It should be noted that demolition of interior walls that may contain hidden and buried reservoirs of asbestos containing pipe and pipe fitting insulation was not conducted as part of the assessment. NCE recommends that prior to demolition of the building,the Contractor should open wall and ceiling cavity areas to confirm hidden and buried asbestos pipe insulation is not encountered. In the event asbestos pipe and pipe fitting insulation is found within wall or ceiling cavities, the ACM should be removed prior to demolition activities beginning. The Exterior Building Caulk is considered a Category I Non-friable asbestos. Category I Non-friable asbestos may remain in a building during demolition. All debris associated the demolition that may contain Category I Non-friable asbestos can be disposed of as construction debris in a landfill that accepts Category I Non-friable asbestos. **Substances are referred to as being"friable"if they can easily become airborne,thus enabling them to become respirable(able to enter human lungs),posing an inhalation health hazard. Asbestos,Lead Based Paint,and Regulated Materials Assessment 2/P a g e 1244 Frederick Street,Hagerstown,MD;Project No.231228-4 1 Norman Creek Environmental Lead-Based Paint The purpose of the LBP inspection was to gain a general understanding of whether LBP is present in the painted surfaces at the Site,and if so,what types of components contain LBP. Representative interior and exterior painted components were selected for testing at the discretion of the NCE Inspector. NCE's William Montley conducted XRF analyses using a SciAps X-550 PMI XRF analyzer. Prior to and subsequent to each inspection event,"validation checks"were performed to ensure that the XRF measurements taken during the inspection truly reflect lead levels at the inspection sample points. NCE performed validation check measurements on the National Institute of Standards and Technology (NIST) Standard Reference Material using the nominal 1.0 milligram per cubic centimeter (mg/cm2) paint film. In accordance with the manufacturer's recommendations, each validation check was a 20-second nominal sample of the NIST Standard Reference Material.All validation check readings were within this range. A total of 82 XRF readings were taken during the inspection. All XRF readings are provided as an attachment to this report ("XRF Sampling Data"). Readings with an upper limit of greater than 0.70 mg/cm2 are considered "positive". Each different component type found to be positive is listed here: Main House • Column, wood,white, Exterior, Front Porch • Window,wood,white, Exterior, Front Porch • Window frame,wood,white, Exterior, Front Porch • Door frame,wood,white, Exterior, Front Porch • Ceiling deck,wood,white, Exterior, Front Porch • Porch soffit, wood, white, Exterior, Front Porch • Door,wood,white, Exterior, East Wall • Door frame,wood,white, Exterior, East Wall • Siding,wood,white, Exterior, East Wall (assumed) • Window,wood,white, Exterior, East,Wall • Window frame,wood,white, Exterior, East,Wall Garage • Wall siding, wood, light green, Exterior, Garage Based on the assessment, it appears that no interior components were found to contain lead-based paint in the Main House. Several exterior components were identified as containing lead based paint on the Main House and Garage Building. Asbestos,Lead Based Paint,and Regulated Materials Assessment 3/P a g e 1244 Frederick Street,Hagerstown,MD;Project No.231228-4 1 Norman Creek Environmental Contractors impacting surfaces containing lead must adhere to OSHA's Lead in Construction Standard (29 CFR 1926.62). Lead-containing materials should also be sampled and analyzed using the Toxicity Characteristic Leaching Procedure (TCLP) with lead analysis to ensure proper waste segregation and disposal (40 CFR 261.24 and COMAR 26.13.02.14). Other Regulated Materials NCE conducted the inspection of"other regulated materials" as follows: Fluorescent Tubes (Mercury) Mercury is used to generate light in all fluorescent lamps. When electric current passes through mercury vapor, the mercury emits ultraviolet energy that passes through the phosphor coating producing light. Mercury-containing lamps are considered to be hazardous waste unless tested using the Toxicity Characteristic Leaching Procedure (TCLP). The TCLP test simulates landfill-leaching conditions; specifically how much mercury will leach out of the waste when exposed to typical landfill conditions. If the leachable amount of mercury is equal to or greater than 0.2 mg/l, the waste is classified as hazardous waste. Disposal of mercury-containing lamps may be managed under the 1995 Universal Waste Rule (UWR). The UWR reduces requirements for generators of certain widely used hazardous wastes including batteries, pesticides, thermostats and fluorescent lamps (added in 1999). Generators may dispose of mercury-containing hazardous lamps under the UWR if they do not exceed certain monthly disposal limits.The UWR reduces costs by streamlining requirements such as: obtaining and EPA ID #,labeling, storing materials on site,responding to releases,training personnel,and tracking and transporting waste. A visual inspection of the entire building was conducted to identify the presence or absence of fluorescent lamps. A lamp-by-lamp count was not conducted; rather quantities of fluorescent lamps are estimates based on observations and professional judgment. There are approximately 15 fluorescent tubes in the building and garage. Refrigeration Systems (Chlorofluorocarbons): Chlorofluorocarbons (CFC) are organic compounds, used as refrigerants. DuPont's brand name for CFC is "Freon". CFCs are also used as propellants and solvents. The Asbestos,Lead Based Paint,and Regulated Materials Assessment 4/ "_ 1244 Frederick Street,Hagerstown,MD;Project No.231228-4 1 Norman Creek Environmental concern related to CFCs is their capacity for atmospheric ozone depletion, when released. Section 608 of the Clean Air Act regulates CFCs. These CFC regulations are comprehensive and cover all aspects of CFC use, handling and disposal. That said, it is important that disposal of all CFC-containing equipment adheres to requirements outlined by Section 608 of the Clean Air Act. A visual inspection of the entire building was conducted to identify equipment that may contain CFCs (e.g. equipment with refrigeration systems in place such as air conditioning units, vending machines, chillers, refrigeration units). Visually Identified items are listed below: • No CFC containing equipment was noted. Fluorescent Light Ballasts (PCBs) Processing and use of polychlorinated biphenyls (PCB) was banned in 1979 in the United States. Prior to that, PCBs were commonly used as insulators in electrical equipment because they have a high tolerance to heat, do not burn easily and are not explosive. Fluorescent light ballasts manufactured before 1979 may contain PCBs. Ballasts manufactured on or after 1979 that do not contain PCBs should be labeled"No PBCs". If a ballast is not labeled "No PCBs", it should be assumed to contain PCBs. Ballasts known or assumed to contain PCBs should be removed, transported and disposed of in accordance with Maryland and EPA guidelines for handling PCB hazardous waste. A visual inspection of the entire building was conducted to identify the presence or absence of fluorescent light ballasts in the building. Approximately 5 fluorescent light ballasts were identified during the inspection. A portion of these ballasts were checked for PCB's, each ballast checked was not labeled "No PCB's". The ballasts should be assumed to contain PCB's unless labeled as containing No PCB's. Thermostats &Thermometers (Mercury): Certain thermostats contain mercury switches used to turn heating and cooling systems on and off. The mercury is contained in a small glass ampoule.Most mercury thermostats were made between 1953 - 1990. Mercury-containing thermostats are considered to be hazardous waste. Disposal of mercury-containing thermostats may be managed under the 1995 Universal Waste Asbestos,Lead Based Paint,and Regulated Materials Assessment 5/P a g e 1244 Frederick Street,Hagerstown,MD;Project No.231228-4 1 Norman Creek Environmental Rule (UWR). The UWR reduces requirements for generators of certain widely used hazardous wastes including batteries, pesticides,thermostats and fluorescent lamps. Generators may dispose of mercury-containing hazardous thermostats under the UWR if they do not exceed certain monthly disposal limits.The UWR reduces costs by streamlining requirements such as: obtaining and EPA ID #, labeling, storing materials on site, responding to releases, training personnel, and tracking and transporting waste. A visual inspection of the entire building was conducted to identify the presence or absence of thermostats. No mercury containing thermostats were noted. Petroleum Products Small quantities (ie: quart size oil containers) of oil, and other petroleum based products are considered HHW and can be disposed of or recycled at an approved citizen drop off treatment of recycling facility according to MDE. Larger quantities (ie: 50 gallon drums) must be disposed of at separate facilities licensed to accept larger quantities of these items. The below listings are all oil,and petroleum based products identified in the building. Small quantity items can be disposed of at approved citizen drop off centers while large quantity items will need to be transported by a licensed shipper, and disposed of at a regulated facility. Petroleum Product/Oil/Lubricants • Two quarts of Automatic Transmission Fluid were noted in the Garage Fire Suppression Equipment Office buildings typically contain fire suppression equipment such as chemical fire extinguishers or fire suppression systems. In areas where important documents are stored buildings will sometimes have chemical gas fire suppression systems to avoid sprinkler systems destroying documents in the event of a fire. Dry chemical Fire Extinguishers (Multi-Purpose ABC rated) typically contain sodium bicarbonate, or potassium bicarbonate. While these chemicals are non-hazardous pressure in the extinguishers must be released prior to disposal. For a building with a large amount of these fire extinguishers a certified safety company should be contracted to dispose of the extinguishers if they will not be re-used, or re-filled. • No dry chemical fire extinguishers were noted. Asbestos,Lead Based Paint,and Regulated Materials Assessment 6/P a g e 1244 Frederick Street,Hagerstown,MD;Project No.231228-4 Norman Creek Environmental Household Hazardous Waste Household Hazardous Waste (HHW) is defined by USEPA as "Leftover household products that contain corrosive, toxic, ignitable, or reactive ingredients. Products, such as paints, cleaners, oils, batteries, and pesticides that contain potentially hazardous ingredients require special care when you dispose of them". The below listed items were identified during the visual inspection of the building, and meet the criteria for household hazardous waste. These items must be disposed of at a treatment or recycling facility which is certified to accept specific types of household hazardous waste. Paints/Solvents/Cleaners/Other 1-5 gallon Pail of Latex Paint 1-5 gallon Pail Roof Cement 10- 1 gallon containers of Paint 5<1 gallon containers of consumer available products including cleaners, Damp-Rid, etc. Please contact Norman Creek Environmental at 443-690-8659 if you have any questions in reference to this submission. Sincerely, NORMAN CREEK ENVIRONMENTAL William Montley, CHMM, CIE Principal Attachments • Asbestos Containing Materials o Bulk Asbestos Sampling Data o Asbestos Lab Analysis Results o Asbestos Lab Chain of Custody o Asbestos Quantification Data • Lead-Based Paint o XRF Sampling Data o Calibration Check Data Asbestos,Lead Based Paint,and Regulated Materials Assessment 7 l P a g e 1244 Frederick Street,Hagerstown,MD;Project No.231228-4 Address: 1 244 Frederick Street. Hagerstown.MD Date:Tani. 1 0.2023 page:l Bulk Asbestos Sampling Data Inspector:William Montlev Accred: 23-0003591 Sample Area Suspect ACM Friable(v/n) 1 Basement Pipe and pipe Fitting Insulation Y ........................4.............................................................................................;...........................................................................................;.............................................. 2 Basement Pipe and pipe Fitting Insulation Y ......................... .................................................................................... ......................................................................................................................................... 3 Basement Pipe and pipe Fitting Insulation Y .........................4.............................................................................................;...........................................................................................;.............................................. 4 Basement 2x4 Suspended Ceiling Tile Y .......................................................................................................................:...........................................................................................:.............................................. 5 Basement 2x4 Suspended Ceiling Tile Y .........................n.............................................................................................E...........................................................................................E.............................................. 6 Basement 2x4 Suspended Ceiling Tile Y .........................¢........................................................................................................................................................................................;.............................................. 7 Basement Flue Mud Y .........................4.............................................................................................;...........................................................................................;.............................................. 8 Basement Flue Mud Y .........................¢........................................................................................................................................................................................;.............................................. 9 Basement Flue Mud Y .........................4.............................................................................................;...........................................................................................;.............................................. 10 Basement,Stairwell Plaster N .........................a...................................................................................................................................................................................................................................... 11 1st Floor,Living Room Plaster N .........................n.............................................................................................E...........................................................................................E.............................................. 12 2nd Floor,Bedroom Plaster N .........................¢........................................................................................................................................................................................;.............................................. 13 1st Floor,Kitchen Sheet Floor and Mastic N .........................4.............................................................................................;...........................................................................................;.............................................. 14 1st Floor,Kitchen Sheet Floor and Mastic N .........................¢........................................................................................................................................................................................;.............................................. 15 Basement Stairway Sheet Floor and Mastic N .........................4.............................................................................................;...........................................................................................;.............................................. 16 Basement Stairway Sheet Floor and Mastic N .......................................................................................................................:...........................................................................................:.............................................. 17 1st Floor,Kitchen 12x12 VCT and Masic N .........................n.............................................................................................E...........................................................................................E.............................................. 18 1st Floor,Kitchen 12x12 VCT and Masic N .........................¢........................................................................................................................................................................................;.............................................. 19 1st Floor,Kitchen Sheet Floor and Mastic(Bottom) N .........................4.............................................................................................;...........................................................................................;.............................................. 20 1st Floor,Kitchen Sheet Floor and Mastic(Bottom) N .........................¢........................................................................................................................................................................................;.............................................. 21 1st Floor,Rear Mud Room 12x12 VCT and Masic N .........................4.............................................................................................;...........................................................................................;.............................................. 22 1st Floor,Rear Mud Room 12x12 VCT and Masic N ........................a...................................................................................................................................................................................................................................... 23 1st Floor,Rear Bathroom 12x12 VCT and Masic N .........................n.............................................................................................E...........................................................................................E.............................................. 24 1st Floor,Rear Mud Room 12x12 VCT and Masic N .........................¢........................................................................................................................................................................................;.............................................. 25 1st Floor,Kitchen Ceiling Stucco Plaster N .........................4.............................................................................................;...........................................................................................;.............................................. 26 1st Floor,Kitchen Ceiling Stucco Plaster N .........................¢........................................................................................................................................................................................;.............................................. 27 1st Floor,Kitchen Ceiling Stucco Plaster N .........................4.............................................................................................;...........................................................................................;.............................................. 28 1st Floor,Dining room Ceiling Stucco Skim N .......................................................................................................................:...........................................................................................:.............................................. 29 1st Floor,Dining room Ceiling Stucco Skim N 30 1st Floor,Rear Sunroom 2x4 Suspended Ceiling Tile Y Address: 1 244 Fredrerick Street Date:Jan 1 0.2024 Page:2. Havgerstown.MD Bulk Asbestos Sampling Data Inspector:William Montlev Accred: 23-0003591 Sample Area Suspect ACM Friable(v/n) 31 1st Floor,Rera Sunroom 2x4 Suspended Ceiling Tile Y 4.............................................................................................:...........................................................................................:.............................................. 32 2nd Floor,Bedroom Ceiling Stucco Skim and Compound N .........................¢........................................................................................................................................................................................;.............................................. 33 2nd Floor,Bedroom Ceiling Stucco Skim and Compound N .........................4.............................................................................................;...........................................................................................;.............................................. 34 2nd Floor,Bedroom Ceiling Stucco Skim and Compound N .......................................................................................................................:...........................................................................................:.............................................. 35 2nd Floor,Bathroom 6x6 VCT and Mastic N .........................n.............................................................................................E...........................................................................................E.............................................. 36 2nd Floor,Bathroom 6x6 VCT and Mastic N .........................¢........................................................................................................................................................................................;.............................................. 37 2nd Floor Bedroom Closet Drywall/Joint Compound N .........................4.............................................................................................;...........................................................................................;.............................................. 38 2nd Floor Bedroom Closet Drywall/Joint Compound N .........................¢........................................................................................................................................................................................;.............................................. 39 Exterior Roof Shingle N .........................4.............................................................................................;...........................................................................................;.............................................. 40 Exterior Roof Shingle N .........................4.............................................................................................;...........................................................................................;.............................................. 41 Exterior Wall Shingle N .........................n.............................................................................................E...........................................................................................E.............................................. 42 Exterior Wall Shingle N .........................¢........................................................................................................................................................................................;.............................................. 43 Exterior Caulk N .........................4.............................................................................................;...........................................................................................;.............................................. 44 Exterior Caulk N .........................¢........................................................................................................................................................................................;.............................................. 45 Basement Expansion Tank Lining N .........................4.............................................................................................;...........................................................................................;.............................................. 46 Basement Expansion Tank Lining N .......................................................................................................................:...........................................................................................:.............................................. 47 Basement Expansion Tank Lining N .........................n.............................................................................................E...........................................................................................E.............................................. 48 Chicken Coup Roof Membrane N .........................¢........................................................................................................................................................................................;.............................................. 49 Chicken Coup Roof Membrane N .........................4.............................................................................................;...........................................................................................;.............................................. 50 .........................¢........................................................................................................................................................................................;.............................................. 51 .........................4.............................................................................................;...........................................................................................;.............................................. 52 .........................4.............................................................................................;...........................................................................................;.............................................. 53 .........................:..............................................................................................:...........................................................................................:.............................................. 54 .........................¢........................................................................................................................................................................................;.............................................. 55 .........................4.............................................................................................;...........................................................................................;.............................................. 56 .........................¢........................................................................................................................................................................................;.............................................. 57 .........................4.............................................................................................;...........................................................................................;.............................................. 58 .......................................................................................................................:...........................................................................................:.............................................. 59 60 sanhir .i. Technologies Laboratory The Ide I f icotion Spec al sts Analysis Report prepared for Norman Creek Environmental LLC Report Date: 1/19/2024 Project Name: Project #: 1244 Frederick St SanAir ID#: 24002123 TESTING NVLAP LAB CODE 200870-0 10501 Trade Court I North Chesterfield, Virginia 23236 888-895-117711804.897.1177 I fax:804.897.0070 i IAQ@SanAir.com I SanAir.com Page 1 of 14 SanAir ID Number A7 24002123 i r FINAL REPORT Technologies Laboratory 1/19/2024 1:09:17 PM Name: Norman Creek Environmental LLC Project Number: 1244 Frederick St Address: 416 Katherine Avenue P.O. Number: Essex, MD 21221 Project Name: Phone: 443-690-8659 Collected Date: 1/10/2024 Received Date: 1/12/2024 10:00:00 AM Dear Wm Montley, We at SanAir would like to thank you for the work you recently submitted. The 49 sample(s) were received on Friday, January 12, 2024 via UPS. The final report(s) is enclosed for the following sample(s): 01, 02, 03, 04, 05, 06, 07, 08, 09, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34, 35, 36, 37, 38, 39, 40, 41, 42, 43, 44, 45, 46, 47, 48, 49. These results only pertain to this job and should not be used in the interpretation of any other job. This report is only complete in its entirety. Refer to the listing below of the pages included in a complete final report. Sincerely, /d Sandra Sobrino Asbestos & Materials Laboratory Manager SanAir Technologies Laboratory Final Report Includes: - Cover Letter -Analysis Pages - Disclaimers and Additional Information Sample conditions: - 3 samples in Discrepancy w/COO condition. (#25, #26, #27) -46 samples in Good condition. 10501 Trade Ct., N. Chesterfield, VA 23236 1 804.897.1177 1 Fax: 804.897.0070 www.SanAir.com IAQ@SanAir.com Page 2 of 14 SanAir ID Number A7 24002123 i r FINAL REPORT Technologies Laboratory 1/19/2024 1:09:17 PM Name: Norman Creek Environmental LLC Project Number: 1244 Frederick St Address: 416 Katherine Avenue P.O. Number: Essex, MD 21221 Project Name: Phone: 443-690-8659 Collected Date: 1/10/2024 Received Date: 1/12/2024 10:00:00 AM Analyst: Hogrefe, Sarah Sanchez, Meivis I Jones, Virginia I Mayes, Jean I Forman, Sydney Asbestos Bulk PLM EPA 600/R-93/116 . .- 01 /24002123-001 Grey 25%Cellulose 10%Other 65%Chrysotile Pipe Insulation-Basement Fibrous Homogeneous 02/24002123-002 Grey 25%Cellulose 10%Other 65%Chrysotile Pipe Insulation-Basement Fibrous Homogeneous 03/24002123-003 Grey 45%Cellulose 20%Other 35%Chrysotile Pipe Insulation-Basement Fibrous Heterogeneous 04/24002123-004 White 90%Cellulose 10%Other None Detected 2x4 Sct-Basment Fibrous Homogeneous 05/24002123-005 White 90%Cellulose 10%Other None Detected 2x4 Sct-Basment Fibrous Homogeneous 06/24002123-006 White 90%Cellulose 10%Other None Detected 2x4 Sct-Basment Fibrous Homogeneous 07/24002123-007 Grey 75%Other 25%Chrysotile Flue Mud-Basement Fibrous Homogeneous 08/24002123-008 Grey 75%Other 25%Chrysotile Flue Mud-Basement Fibrous Homogeneous 09/24002123-009 Grey 75%Other 25%Chrysotile Flue Mud-Basement Fibrous Homogeneous 10/24002123-010 Grey 100%Other None Detected Plaster-Basement Stairwell, Plaster Non-Fibrous Homogeneous Analyst: Approved Signatory: Analysis Date: 1/19/2024 Date: 1/19/2024 Page 3 of 14 SanAir ID Number A7 24002123 i r FINAL REPORT Technologies Laboratory 1/19/2024 1:09:17 PM Name: Norman Creek Environmental LLC Project Number: 1244 Frederick St Address: 416 Katherine Avenue P.O. Number: Essex, MD 21221 Project Name: Phone: 443-690-8659 Collected Date: 1/10/2024 Received Date: 1/12/2024 10:00:00 AM Analyst: Hogrefe, Sarah I Sanchez, Meivis I Jones, Virginia I Mayes, Jean I Forman, Sydney Asbestos Bulk PLM EPA 600/R-93/116 .- 10/24002123-010 White 100%Other None Detected Plaster-Basement Stairwell,Skim Non-Fibrous Coat Homogeneous 11 /24002123-011 Grey 100%Other None Detected Plaster-1st Floor Living Room, Non-Fibrous Plaster Homogeneous 11 /24002123-011 White 100%Other None Detected Plaster-1st Floor Living Room, Non-Fibrous Skim Coat Homogeneous 12/24002123-012 Grey 100%Other None Detected Plaster-2nd Floor Bedroom, Non-Fibrous Plaster Homogeneous 12/24002123-012 White 100%Other None Detected Plaster-2nd Floor Bedroom,Skim Non-Fibrous Coat Homogeneous 13/24002123-013 White 25%Cellulose 75%Other None Detected Sheet Floor&Masticlst Fl Non-Fibrous Kitchen,Sheet Floor Heterogeneous 13/24002123-013 Yellow 100%Other None Detected Sheet Floor&Masticlst Fl Non-Fibrous Kitchen,Mastic Homogeneous 14/24002123-014 White 25%Cellulose 75%Other None Detected Sheet Floor&Masticlst Fl Kit, Non-Fibrous Sheet Floor Heterogeneous 14/24002123-014 Tan 100%Other None Detected Sheet Floor&Masticlst Fl Kit, Non-Fibrous Mastic Homogeneous 15/24002123-015 Brown 55%Cellulose 45%Other None Detected Sheet Floor&Mastic Basement Non-Fibrous Stair,Sheet Floor Heterogeneous Analyst: Approved Signatory: Analysis Date: 1/19/2024 Date: 1/19/2024 10501 Trade Ct., N. Chesterfield, VA 23236 1 804.897.1177 1 Fax: 804.897.0070 1 www.SanAir.com I IAQ@SanAir.com Page 4 of 14 SanAir ID Number A7 24002123 i r FINAL REPORT Technologies Laboratory 1/19/2024 1:09:17 PM Name: Norman Creek Environmental LLC Project Number: 1244 Frederick St Address: 416 Katherine Avenue P.O. Number: Essex, MD 21221 Project Name: Phone: 443-690-8659 Collected Date: 1/10/2024 Received Date: 1/12/2024 10:00:00 AM Analyst: Hogrefe, Sarah I Sanchez, Meivis I Jones, Virginia I Mayes, Jean I Forman, Sydney Asbestos Bulk PLM EPA 600/R-93/116 .- 15/24002123-015 Black 100%Other None Detected Sheet Floor&Mastic Basement Non-Fibrous Stair,Mastic Homogeneous 16/24002123-016 Tan 55%Cellulose 45%Other None Detected Sheet Floor&Mastic Basement Fibrous Stair,Sheet Floor Heterogeneous 16/24002123-016 Black 100%Other None Detected Sheet Floor&Mastic Basement Non-Fibrous Stair, Mastic Homogeneous 17/24002123-017 Black 100%Other None Detected 12x12 Vct&Mastic-1st Fl Kitchen, Non-Fibrous Tile Heterogeneous 17/24002123-017 Yellow 100%Other None Detected 12x12 Vct&Mastic-1st Fl Kitchen, Non-Fibrous Mastic Homogeneous 17/24002123-017 White 100%Other None Detected 12x12 Vct&Mastic-1st Fl Kitchen, Non-Fibrous Mastic Homogeneous 18/24002123-018 Black 100%Other None Detected 12x12 Vct&Mastic-1st Fl Kitchen, Non-Fibrous Tile Heterogeneous 18/24002123-018 Yellow 100%Other None Detected 12x12 Vct&Mastic-1st Fl Kitchen, Non-Fibrous Mastic Homogeneous 19/24002123-019 Red 15%Cellulose 85%Other None Detected Sheet Flooring&Mastic(Bottom) Non-Fibrous 1st Fl Kitchen,Sheet Floor Heterogeneous 19/24002123-019 Brown 100%Other None Detected Sheet Flooring&Mastic(Bottom) Non-Fibrous 1st Fl Kitchen,Mastic Homogeneous Analyst: Approved Signatory: Analysis Date: 1/19/2024 Date: 1/19/2024 10501 Trade Ct., N. Chesterfield, VA 23236 1 804.897.1177 1 Fax: 804.897.0070 1 www.SanAir.com I IAQ@SanAir.com Page 5 of 14 SanAir ID Number A7 24002123 i r FINAL REPORT Technologies Laboratory 1/19/2024 1:09:17 PM Name: Norman Creek Environmental LLC Project Number: 1244 Frederick St Address: 416 Katherine Avenue P.O. Number: Essex, MD 21221 Project Name: Phone: 443-690-8659 Collected Date: 1/10/2024 Received Date: 1/12/2024 10:00:00 AM Analyst: Hogrefe, Sarah I Sanchez, Meivis I Jones, Virginia I Mayes, Jean I Forman, Sydney Asbestos Bulk PLM EPA 600/R-93/116 . .- 20/24002123-020 Red 15%Cellulose 85%Other None Detected Sheet Flooring&Mastic(Bottom) Non-Fibrous 1st Fl Kitchen,Sheet Floor Heterogeneous 20/24002123-020 Brown 100%Other None Detected Sheet Flooring&Mastic(Bottom) Non-Fibrous 1st Fl Kitchen,Mastic Homogeneous 21 /24002123-021 Grey 100%Other None Detected 12x12 Vct&Mastic 1st Fl Rear Non-Fibrous Mud Rm,Tile Homogeneous 21 /24002123-021 Tan 100%Other None Detected 12x12 Vct&Mastic 1st Fl Rear Non-Fibrous Mud Rm,Mastic Homogeneous 22/24002123-022 Grey 100%Other None Detected 12x12 Vct&Mastic 1st Fl Rear Non-Fibrous Mud Rm,Tile Homogeneous 22/24002123-022 Tan 100%Other None Detected 12x12 Vct&Mastic 1st Fl Rear Non-Fibrous Mud Rm,Mastic Homogeneous 23/24002123-023 Brown 100%Other None Detected 12x12 Vct&Mastic 1st Fl Rear Non-Fibrous Bath,Tile Heterogeneous 23/24002123-023 Tan 100%Other None Detected 12x12 Vct&Mastic 1st Fl Rear Non-Fibrous Bath,Mastic Homogeneous 24/24002123-024 Brown 100%Other None Detected 12x12 Vct&Mastic 1st Fl Rear Non-Fibrous Bath,Tile Heterogeneous 24/24002123-024 Tan 100%Other None Detected 12x12 Vct&Mastic 1st Fl Rear Non-Fibrous Bath,Mastic Homogeneous Analyst: Approved Signatory: Analysis Date: 1/19/2024 Date: 1/19/2024 10501 Trade Ct., N. Chesterfield, VA 23236 1 804.897.1177 Fax: 804.897.0070 1 www.SanAir.com I IAQ@SanAir.com Page 6 of 14 SanAir ID Number A7 24002123 i r FINAL REPORT Technologies Laboratory 1/19/2024 1:09:17 PM Name: Norman Creek Environmental LLC Project Number: 1244 Frederick St Address: 416 Katherine Avenue P.O. Number: Essex, MD 21221 Project Name: Phone: 443-690-8659 Collected Date: 1/10/2024 Received Date: 1/12/2024 10:00:00 AM Analyst: Hogrefe, Sarah Sanchez, Meivis I Jones, Virginia I Mayes, Jean I Forman, Sydney Asbestos Bulk PLM EPA 600/R-93/116 . .- 25/24002123-025 Grey 100%Other None Detected Ceiling Stucco Finish 1st Fl Non-Fibrous Kitchen,Plaster Heterogeneous 25/24002123-025 White 100%Other None Detected Ceiling Stucco Finish 1st Fl Non-Fibrous Kitchen,Skim Coat Homogeneous 25/24002123-025 White 100%Other None Detected Ceiling Stucco Finish 1st Fl Non-Fibrous Kitchen,Texture Heterogeneous 26/24002123-026 Grey 100%Other None Detected Ceiling Stucco Finish 1st Fl Non-Fibrous Kitchen,Plaster Heterogeneous 26/24002123-026 White 100%Other None Detected Ceiling Stucco Finish 1st Fl Non-Fibrous Kitchen,Skim Coat Homogeneous 26/24002123-026 White 100%Other None Detected Ceiling Stucco Finish 1st Fl Non-Fibrous Kitchen,Texture Heterogeneous 27/24002123-027 Grey 100%Other None Detected Ceiling Stucco Finish 1st Fl Non-Fibrous Kitchen,Plaster Heterogeneous 27/24002123-027 White 100%Other None Detected Ceiling Stucco Finish 1st Fl Non-Fibrous Kitchen,Skim Coat Homogeneous 27/24002123-027 White 100%Other None Detected Ceiling Stucco Finish 1st Fl Non-Fibrous Kitchen,Texture Heterogeneous 28/24002123-028 White 100%Other None Detected Ceiling Stucco Finish 1st Fl DR Non-Fibrous Homogeneous Analyst: Approved Signatory: Analysis Date: 1/19/2024 Date: 1/19/2024 10501 Trade Ct., N. Chesterfield, VA 23236 1 804.897.1177 Fax: 804.897.0070 1 www.SanAir.com I IAQ@SanAir.com Page 7 of 14 SanAir ID Number A7 24002123 i r FINAL REPORT Technologies Laboratory 1/19/2024 1:09:17 PM Name: Norman Creek Environmental LLC Project Number: 1244 Frederick St Address: 416 Katherine Avenue P.O. Number: Essex, MD 21221 Project Name: Phone: 443-690-8659 Collected Date: 1/10/2024 Received Date: 1/12/2024 10:00:00 AM Analyst: Hogrefe, Sarah I Sanchez, Meivis I Jones, Virginia I Mayes, Jean I Forman, Sydney Asbestos Bulk PLM EPA 600/R-93/116 . .- 29/24002123-029 White 100%Other None Detected Ceiling Stucco Finish 1st Fl DR Non-Fibrous Homogeneous 30/24002123-030 White 40%Cellulose 20%Other None Detected 2x4 Sct 1st Fl Rear Sunroom Fibrous 40%Glass Homogeneous 31 /24002123-031 Grey 65%Cellulose 10%Other None Detected 2x4 Sct 1st Fl Rear Sunroom Fibrous 25%Glass Homogeneous 32/24002123-032 White 100%Other None Detected Ceiling Stucco-2nd Fl Bedroom, Non-Fibrous Stucco Homogeneous 32/24002123-032 White 100%Other None Detected Ceiling Stucco-2nd Fl Bedroom, Non-Fibrous Compound Homogeneous 33/24002123-033 White 100%Other None Detected Ceiling Stucco-2nd Fl Bedroom, Non-Fibrous Stucco Homogeneous 33/24002123-033 White 100%Other None Detected Ceiling Stucco-2nd Fl Bedroom, Non-Fibrous Compound Homogeneous 34/24002123-034 White 100%Other None Detected Ceiling Stucco-2nd Fl Bedroom, Non-Fibrous Stucco Homogeneous 34/24002123-034 White 100%Other None Detected Ceiling Stucco-2nd Fl Bedroom, Non-Fibrous Compound Homogeneous 35/24002123-035 Black 100%Other None Detected 6x6 Vct&Mastic-2nd Fl Bath, Non-Fibrous Floor Tile Homogeneous Analyst: Approved Signatory: Analysis Date: 1/19/2024 Date: 1/19/2024 10501 Trade Ct., N. Chesterfield, VA 23236 1 804.897.1177 Fax: 804.897.0070 1 www.SanAir.com I IAQ@SanAir.com Page 8 of 14 SanAir ID Number A7 24002123 i r FINAL REPORT Technologies Laboratory 1/19/2024 1:09:17 PM Name: Norman Creek Environmental LLC Project Number: 1244 Frederick St Address: 416 Katherine Avenue P.O. Number: Essex, MD 21221 Project Name: Phone: 443-690-8659 Collected Date: 1/10/2024 Received Date: 1/12/2024 10:00:00 AM Analyst: Hogrefe, Sarah I Sanchez, Meivis I Jones, Virginia I Mayes, Jean I Forman, Sydney Asbestos Bulk PLM EPA 600/R-93/116 . .- 35/24002123-035 Clear 100%Other None Detected 6x6 Vct&Mastic-2nd Fl Bath, Non-Fibrous Mastic Homogeneous 36/24002123-036 Black 100%Other None Detected 6x6 Vct&Mastic-2nd Fl Bath, Non-Fibrous Floor Tile Homogeneous 36/24002123-036 Clear 100%Other None Detected 6x6 Vct&Mastic-2nd Fl Bath, Non-Fibrous Mastic Homogeneous 37/24002123-037 White 10%Cellulose 90%Other None Detected DW/JC 2nd Fl Bedroom Closet, Non-Fibrous Drywall Heterogeneous 37/24002123-037 White 100%Other None Detected DW/JC 2nd Fl Bedroom Closet, Non-Fibrous Joint Compound Homogeneous 38/24002123-038 White 10%Cellulose 90%Other None Detected DW/JC 2nd Fl Bedroom Closet, Non-Fibrous Drywall Heterogeneous 38/24002123-038 White 100%Other None Detected DW/JC 2nd Fl Bedroom Closet, Non-Fibrous Joint Compound Homogeneous 39/24002123-039 Black 10%Glass 90%Other None Detected Roof Shingle-Exterior Non-Fibrous Heterogeneous 40/24002123-040 Black 10%Glass 90%Other None Detected Roof Shingle-Exterior Non-Fibrous Heterogeneous 41 /24002123-041 Various 20%Cellulose 80%Other None Detected Wall Shingle-Exterior Non-Fibrous Heterogeneous Analyst: Approved Signatory: Analysis Date: 1/19/2024 Date: 1/19/2024 10501 Trade Ct., N. Chesterfield, VA 23236 1 804.897.1177 1 Fax: 804.897.0070 1 www.SanAir.com I IAQ@SanAir.com Page 9 of 14 SanAir ID Number A7 24002123 i r FINAL REPORT Technologies Laboratory 1/19/2024 1:09:17 PM Name: Norman Creek Environmental LLC Project Number: 1244 Frederick St Address: 416 Katherine Avenue P.O. Number: Essex, MD 21221 Project Name: Phone: 443-690-8659 Collected Date: 1/10/2024 Received Date: 1/12/2024 10:00:00 AM Analyst: Hogrefe, Sarah Sanchez, Meivis I Jones, Virginia I Mayes, Jean I Forman, Sydney Asbestos Bulk PLM EPA 600/R-93/116 . .- 42/24002123-042 Black 20%Cellulose 80%Other None Detected Wall Shingle-Exterior Non-Fibrous Heterogeneous 43/24002123-043 White 100%Other None Detected Caulk-Exterior Non-Fibrous Homogeneous 44/24002123-044 Grey 97%Other 3%Chrysotile Caulk-Exterior Non-Fibrous Heterogeneous 45/24002123-045 Grey 100%Other None Detected Expansion Tank Living-Basement Non-Fibrous Heterogeneous 46/24002123-046 Grey 100%Other None Detected Expansion Tank Living-Basement Non-Fibrous Heterogeneous 47/24002123-047 Grey 100%Other None Detected Expansion Tank Living-Basement Non-Fibrous Heterogeneous 48/24002123-048 Black 15%Cellulose 85%Other None Detected Roof Membrane-Chicken Coup Non-Fibrous Heterogeneous 49/24002123-049 Black 15%Cellulose 85%Other None Detected Roof Membrane-Chicken Coup Non-Fibrous Heterogeneous Analyst: Approved Signatory: Analysis Date: 1/19/2024 Date: 1/19/2024 10501 Trade Ct., N. Chesterfield, VA 23236 1 804.897.1177 1 Fax: 804.897.0070 1 www.SanAir.com I IAQ@SanAir.com Page 10 of 14 Disclaimer This report is the sole property of the client named on the SanAir Technologies Laboratory chain- of-custody (COC). Results in the report are confidential information intended only for the use by the customer listed on the COC. Neither results nor reports will be discussed with or released to any third party without our client's written permission. The final report shall not be reproduced except in full without written approval of the laboratory to assure that parts of the report are not taken out of context. This report and any information contained within shall not be edited, altered, or modified in any way by any persons or agencies receiving, viewing, distributing, or otherwise possessing a copy of this final report. The laboratory reserves the right to perform amendments to any finalized report, of which shall supersede and make obsolete any previous editions. Such changes, modifications, additions, or deletions shall be effective immediately upon notice thereof, which may be given by means including but not limited to posting on the SanAir client portal website, electronic or conventional mail, or by any other means. The information provided in this report applies only to the samples submitted and is relevant only for the date, time, and location of sampling. The accuracy of the results is dependent upon the client's sampling procedure and information provided to the laboratory by the client on the COC. SanAir assumes no responsibility for the sampling procedure and will provide evaluation reports based solely on the sample(s) in the condition in which they arrived at the laboratory and information provided by the client on the COC, such as: project number, project name, collection dates, po number, special instructions, samples collected by, sample numbers, sample identifications, sample type, selected analysis type, flow rate, total volume or area, and start stop times that may affect the validity of the results in this report. Samples were received in good condition unless otherwise noted on the report. SanAir assumes no responsibility or liability for the manner in which the results are used or interpreted. This report does not constitute nor shall not be used by the client to claim product, process, system, or person certification, approval, or endorsement by NVLAP, NIST, NELAC, AIHA LAP, LLC or any other U.S. governmental agencies and may not be accredited by every local, state, and federal regulatory agencies. Samples are held for a period of 60 days. Fibers smaller than 5 microns cannot be seen with this method due to scope limitations. For NY state samples, method EPA 600/M4-82-020 is performed. NYELAP Disclaimer: Polarized- light microscopy is not consistently reliable in detecting asbestos in floor covering and similar non-friable organically bound materials. Quantitative transmission electron microscopy is currently the only method that can be used to determine if this material can be considered or treated as non-asbestos containing. Asbestos Accreditations National Voluntary Laboratory Accreditation Program (NVLAP) Lab Code 200870-0 City of Philadelphia Department of Public Health Air Management Services, Certification#ALL-460 Commonwealth of Pennsylvania Department of Environmental Protection Number 68-05397 California State Environmental Laboratory Accreditation Program Certificate Number 2915 Colorado Department of Public Health and Environment Registration Number AL-23143 Connecticut Department of Public Health Environmental Laboratory Registration Number PH-01 05 Massachusetts Department of Labor Standards Asbestos Analytical Services License Number: AA000222 State of Maine Department of Environmental Protection License Number: LB-0075, LA-0084 New York State Department of Health Laboratory ID: 11983 State of Rhode Island Department of Health Certification No.: PCM00126, PLM00126, TEM00126 Texas Department of State Health Services License Number: 300440 Commonwealth of Virginia Department of Professional and Occupational Regulation Number: 3333000323 State of Washington Department of Ecology Laboratory ID: C989 State of West Virginia Bureau for Public Health Analytical Laboratory Number: LT000616 Vermont Department of Health License Number: Asb-Co-An-000006 Louisiana Department of Environmental Quality Al Number 212253, Certificate#05088 Revision Date: 4/18/2023 Page 11 of 14 10501 Trade Ct., Suite 100 SanAir ID Number SanhirN. Chesterfield,VA 23236 Asbestos 804.897.1177/888.895.1177 Chain of Custody Fax 804.897.0070 Form 140,Rev 7,10/20/20 2 Technologies Laboratory sanair.com Company: Norman Creek Environmental LLC Project#: ollected byWm. Montley Address: 416 Katherine Avenue I Project Name: Frederick Street Phone#: 443-690-8659 City,5t Zip: Essex, MD 21221 Date Collected:1/10124 Fax It: MD 4186 wmontley0normancreekenv.com State of Collection: Account#: P.O.Number: Email: Bulk Air Soil ABB PLM EPA 600/R-93/116 / ABA PCM NIOSH 74{}0 ABSE PLM EPA 600/R-931116(Qual.) Q Positive Stop ABA-2 OSHA w/TWA* Vermiculite ABEPA PLM EPA 400 Point Count ABTEM TEM AHERA ABB PLM EPA 60018-93/116 ABBIK K PLM EPA 1000 Point Count ABATN TEM NIOSH 7402 JJ AI3EPA3 PLM EPA 400 Point Count ABBEN PLM EPA NOB** ABT2 TEM Level 11 EJ ABCM Cincinnati Method ❑ ABI3CH TEM Chatfield** E] Other: Dust ABBTM TEM EPA NOB** ABWA TEM Wipe ASTM D-6480 fl New York ELAP ABQ PLM Qualitative ABEPA2 NY ELAP 198.1 ABDMV TEM Microvac ASTM D-5755 f ** Available on 24-hr.to 5-day TAT ABENY NY ELAP 198.6 PLM NOB ABBNY NY ELAP 198.4 TEM NOB Water Matrix Other ABHE EPA 100.2 Positive Stop I ❑ Turn Around 3 HR(4 HR TEM) 0 6 HR(8HR TEM) 0 12 HR 0 1 Day 0 Times p 2 Days 0 3 Days 0 4 Days R 5 Days Special Instructions Volume Sample Flow Start—Stop Sample# Sample Identification/Location or Area Date Rate* Time* to 21 122. e w Jl'�l — 051 2¼L ≥!f sn e n, r 06 ol Fl, — 0 ritie. yvl d -- • _n�-�iv� ID P14"'TC L _ 5ral r U l / elfin uis ed b D to Time Received by Date Time � 1 -' -- If no technician is provided,then the primary contact for your account will be selected.Unless scheduled,the turnaround time for all samples received after 3 pm EST will be logged in the next business day.Weekend or holiday work must be scheduled ahead of time and is charged at 150%of the 3hr TAT or a minimum charge of $150. A courier charge will be applied for same day and one-day turnaround times for offsite work.SanAir covers Ground and Next Day Air shipping.Shipments billed to SanAir with a faster shipping rate will result in additional charges. Pa 12 of 14 Pagc- -of,L Form 140,Revision 1, 1/20120 17 Volume or Sample Flow Start—Stop Sample# Sample Identification/Location Area Date Rate* Time* 3 -.4' V 1 `c" ? fl/5C /'r i, ,e aT X Z B �/�Sy1 ;I Z L-'C7 /7',0S C l it 5a / T T 57 /c' / 5/ f7P4 y n I vw /232 "/ui <: jt'cf0 2I°,q b4 _______ _________ _____ 3" •A,ic cc"/f2 -- G � vr - fit•a✓L, CAwik- Special Instructions Relinquished by Date Time Received by Date Time -I- 3f1L_ , /D�� If no technician is provided,then the primary contact for your account will be selected.Unless scheduled,the turnaround time for all samples received after 3 pm EST will be logged in the next business day.Weekend or holiday work must be scheduled ahead of time and is charged at 150%of the 3hr TAT or a minimum charge of$150. A courier charge will be applied for same day and one-day turnaround times for o site w k. SanAir covers Ground and Nest Day Air shippini. Shipments billed to SanAir with a faster shipping rate will result in additional charges. Pagefm Page 13 of 14 Form 140.Revision I. 1/20/2017 ca40V L c Volume or Sample Flow Start—Stop Sample# Sample Identification/Location Area Date Rate* * Time e t1 - "d� •�, om. .QVSl J7JL. C I.-4 ' A u�1 777NJC J.i,. f * J2• r e — Gig✓ /,► C G 2 v'e -- _ rJ Special Instructions FRelinquis4Vd b Date Time Received b Date Time 1\L4c �31�� ► f la.�c�f"r►�^� If no technician is provided,then the primary contact for your account will be selected.Unless scheduled,the turnaround time for all samples received after 3 pm EST will be logged in the next business day.Weekend or holiday work must be scheduled ahead of time and is charged at 150%of the 3hr TAT or a minimum charge of$150. A courier charge will be applied for same day and one-day turnaround times for offsite work. SanAir covers Ground and Next Day Air shipping. Shipments billed to SanAir with a faster shipping rate will result in additional charges. Page3of 5 T Page 14 of 14 ro O O M M N N m M m N N VI — Ol O. N M M O M O O 1O N — cV M d O O O — _ - V M O O O O p — ro 00 M N N \O 0 — - N — V —m V M N. — — (-'I — M M V _ Ln U Q O L CL L N N N N N VI N LO °O 7 7 7 7 7 7 7 ,O N U- _ _ _ _ _ _ _ o w C C C C C C C m M o E � e ro > d J m m QUO _b.0 b.0 _b.0 _ E t y 0 0 0 0 0 0 0 ro L L L L L L L H- 4) GJc r v K o ; LL a " O as L ❑ + +❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ •� N O z z z z z z >- Z W u. _ z 0 a L V 0 >. C 0 V 'N .O ° N I a 0 ro v ro ~ N Z ur 7 1:- V 0 C L u ro U ate.+ A l Q N V b ctl C bq LL O V LL v v ro v m ao c d L d L v ro — : ro �C `L ~ U v N (d ° L M N J N a ro L O O L C ro ro $ ° $ u E D H LL C) LL C Cl C) T ° C) C w c (1) > ° 0 v v LU m z ro O —z — Q as - � 2 N. / N. N. R $ + g / / ® \ j / \ / \ \ / Q g \ @ \ ^ / \ \ # § a) p L CL § \ \ U U 0 0 0 \ § E E _ _ _ k t \ \ 0 0 = : : .: q Q $ d / f m u \ ) 2 2 % % % % 0 5 5 5 § § 2 2 O LL � j j x 8 k § i / / \ \ t } - � ) _ _ U C e O » 2 2 2 2 2 2 * 2 2 2 / > / - Z z z z z z z z z z ZuJz u. ° % �o ^ \ | !t /y | c u \ CO 0 e 6 -O / 7 § § \ \ } j \ 2 } Al I : > / E _ _ § $ . / > y : O \ O e ® a U ~ ~ / 2 0 0)/ \y t 4 4 ± _ y p u / / ° \ \ \ I- : � j9 \ W II z - - - I If)_ - N.- - - } § \ \ ` « < > z ro O O M M N N m M m N N VI — Ol O. N M M O M O O 1O N — cV M d O O O — _ - V M O O O O p — ro 00 M N N \O 0 — - N — V —m V M N. — — (-'I — M M V _ Ln U Q O L CL L N N N N N VI N LO °O 7 7 7 7 7 7 7 ,O N U- _ _ _ _ _ _ _ o w C C C C C C C m M o E � e ro > d J m m QUO _b.0 b.0 _b.0 _ E t y 0 0 0 0 0 0 0 ro L L L L L L L H- 4) GJc r v K o ; LL a " O as L ❑ + +❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ •� N O z z z z z z >- Z W u. _ z 0 a L V 0 >. C 0 V 'N .O ° N I a 0 ro v ro ~ N Z ur 7 1:- V 0 C L u ro U ate.+ A l Q N V b ctl C bq LL O V LL v v ro v m ao c d L d L v ro — : ro �C `L ~ U v N (d ° L M N J N a ro L O O L C ro ro $ ° $ u E D H LL C) LL C Cl C) T ° C) C w c (1) > ° 0 v v LU m z ro O —z — Q as - � 2 N. / N. N. R $ + g / / ® \ j / \ / \ \ / Q g \ @ \ ^ / \ \ # § a) p L CL § \ \ U U 0 0 0 \ § E E _ _ _ k t \ \ 0 0 = : : .: q Q $ d / f m u \ ) 2 2 % % % % 0 5 5 5 § § 2 2 O LL � j j x 8 k § i / / \ \ t } - � ) _ _ U C e O » 2 2 2 2 2 2 * 2 2 2 / > / - Z z z z z z z z z z ZuJz u. ° % �o ^ \ | !t /y | c u \ CO 0 e 6 -O / 7 § § \ \ } j \ 2 } Al I : > / E _ _ § $ . / > y : O \ O e ® a U ~ ~ / 2 0 0)/ \y t 4 4 ± _ y p u / / ° \ \ \ I- : � j9 \ W II z - - - I If)_ - N.- - - } § \ \ ` « < > z I N N O o O O O O O O O O bfl 0 0 0 0 0 0 0 0 o U 0 O O O O O O O O O O dj - O O O O O O O O O p w w w w w w w w w w N N N N N N N N N N CO v as � o + U N a z z z z z z z z z o a�� o on g o o w z o ,� + o -6 0 O O ~ °c. _ E o ti c' o + O - A Q 0 io II Z Cl Cl Cl Cl Cl Cl N Cl N OM z I N N O N O O O O O O O O O 0 bfl ) U v fi fi fi fi fi fi fi fi fi P�- O O O O O O O O O N N N N N N N N N N N Co v as o � o + 0 C -- N o v a� a N -o o y z z z z z z o A Q cu io J o' A J Z w H N M v 0 l� 00 0 O Z M M M M M M M M M z I N N O O O O O O O O O O O ci o y a a a a a O O O O ° °o °o °o °o °o °o w w w w N N N N N N N N N N r N CO v as o � o + O O O O t— N o0 N O M M N O O O O O O O O O O N y c z z z z z z z z z z � ) v bq cN _cl OO OO E O O A U U O Q U Q d W Q � aai cu io J I J Zw � N M v N oc O + I N N O O O O O O on on on on on C C C C E E E E vD vD vD vD vD u 0 0 0 O O o O O O O O I) 00 OO OO OO OO w N N N N N w w w w N CO v as o � o + O G� o o `O -- N o -- o O O 0 0 O 0 O O 0 0 N ) y z � 0 Y —, ) +. +' p -6 y - p 'C U O N cd • 'OC n E cfD ca u M Q Eo J J Z w N M v 0 N00 0 E I N N O - - r"I ° ° ° ° ° u Q Q Q Q Q o 0 O ° ° o o o o w w w O 0 0 0 0 p w w N N N N CO v as � o + x w N C N N 0O o � .� O• O N a o y z z z z z z o o o I—I U s. b�A a N O - Q W � cu iM cu ° °� A J Izw Z + Z I N N O '-" O O O O 0 cl E E o cn cn O b•-i 0 0 O O O ct a � w w w w w pa pa pa N CO v as o � o + V — O — — N — .o c z z z z z z z z � U - - 1) W u Z N O a O a O m cd O O O U s— c' O A • U a ioMM h�l °> A J Izw N M v 0 N00 0 z I N N O a o � U - V p U I--I aN Lama N 00 d o v as + o O — — O — O N yr 0 © OO © © © a� yC 04 o o o N z z z z � U - - 1) ZbA bA bA Z bA bA bA U U U A m d o cu u M Q a= M cu Eo a -J Z w N M v 0 l� 0O 0 © + O z o0 0O 0O 0O 0O 0O 0O 0O 0O z INSTRUMENT CALIBRATION REPORT 4h1 Pine i n�'inrnmental Seri-ices LLC 747 Cltrtnwa Park Dr. Suitt:4 Alto Burnic,MD 2l(1(' Pine Environmental Services, Inc. Iastruatrnt ID 3467.1 11e+cription S iAps X-550 XRF t'nitrated t�Ar2i12s 4:5O:4SP%f slanufacturer SciAps State Certint-d Model Somber Xis{l Status Pass `vrittl'lumber Lol 11124'7 ramp°C' 21 tiutttlu;r Location .L rVland Humldll, % 23 Ilti partrnent Calibration SIkiitrcations Group# i Group t me Cahbta ian't'cst.5artVle Stsflctard'rest -rest Prrtorn";Yes •1*Found Result: Pass As Left IU�exult.. Pass tit Tr.n1ut s Used Ilurrttt:the CaLtlrrt J1 .a [ 'al Entri Da r ) r 4rtklrte n scri ii�u 41 4rr1�rf+tetarcr Serial Vumhut� 1`lesl Cal Ihte _ Ladd Nuasber Lut \urnb Lint Cj.J Dir 'kt i r to tlt+trst flute Nam about this itrtFbratian Uat[brrtttan Hilt Calihratlon Suct�tasiul "'fibre Calibrated Z.ch Hatfield All instruments are calibrated by Pine Enti-tmnmenn i Services LI.C According to the manufacturer's }pccifications. but it is the customer's rc.q nsibility to calibrate and maintain this unit in accordance with the manutactlrrcr's Specifications atld'or the customct's owl, specific nods. M1ntifv Pinta Environmental Sera-fires LLC of arty defect within 24 hours of receipt of equipment Please call 500.301-9663 fur 7echnicai :issistattce l'me Envmnrnental Sr r c s LLC Windsor Ind,ectrrat Park,142 North Marc Stvact.H1dlt etl,WindsrK,NJ 011.561, R{ltl- D1-Qt %w prne--cm-Liw"AcnfaLcm rn WASHINGTON COUNTY DIVISION OF PERMITS & INSPECTIONS Wa ngtonCounty 747 Northern Avenue Hagerstown,MD 21742-2723,P 240.313.2460 r.240.313.2461 i Hearing Impaired:7-1-1 BUILDING & ZONING PERMIT IVR/Record No: 2024-00586 Applied: 2/9/2024 Project No: Approved: Record Type: Residential Demolition Status: Review Permit Inspector Area: B3 Job Address: 1244 FREDERICK Street Location: LOR 1244 Frederick Street Tax Acct ID: 10019192 Zoning District: RS Floodplain: No Owner: WASH CO COMMISSIONERS BOARD OF Applicant: Eric Miklosovich 747 Northern Avenue Hagerstown MD 21742 Phone No: (240)313-2448 Email Address: emiklosovich@washco-md.net Contractor: Phone No: Description: Demolition of 1,288 sq.ft. dwelling and any associated outbuildings,fill in basement, remove driveway pavement and sidewalks Foundation Size: Construction Type: Type of Heat: Exterior Finish: Public Sewer: Yes Air Conditioning: Public Water: Yes Septic: Gas: Time Existed: Electric: Well: Time Existed: Valuation: No.of Bathrooms: Code Enforced: No.of Half Bathrooms: No.of New Bedrooms: No.of Exist. Bedrooms: Setbacks Proposed Minimum Required Lot Tract Area Front Yard Setback Rear Yard Setback Left Side Setback Right Side Setback Lot Width *All final State Fire Marshal inspections(850), if required, must be scheduled directly through the State Fire Marshal's office at 301- 766-3888. This permit has been reviewed by the Washington County Permitting Department and meets all applicable local and state codes and ordinances. Should you have any questions, please contact our department at 240-313-2460 between the hours of 7:30 a.m. through 4:30 p.m., Monday through Friday. WASHINGTON COUNTY DIVISION OF PERMITS & INSPECTIONS WashingtvnCounty 747 Northern Avenue'Hagerstown,MD 21742-2723 240.313.2460 240.313.2461 Hearing Impaired:7-1-1 Project No: Activity No: 2024-00586 Permit Type: Residential Demolition Permit CONDITIONS 1. The issuance of this permit does not constitute approval from the Maryland Department of the Environment(800-633-6101)or the Potomac Edison Company(301-582-5210). Prior to the demolition of this project,please contact these agencies directly to determine if their approval is necessary. MDE requires a Notice of Intent to Demolish form to be filled out by the owner or demolition contractor and emailed to demomde@maryland.gov. A blank form can be obtained from the following link https://mde.maryland.gov/programs/air/Asbestos/documents/noi20 13_(2).pdf 2. All debris is to be removed within 30 days of demolition. INSPECTIONS TO BE SCHEDULED Inspection Type Action Date Staff 960:Removal *All final State Fire Marshall inspections (850),if required, must be scheduled directly through the State Fire Marshal's office at 301-766-3888. 1244 Frederick Street 1 ` S fl V� r � 1 0 .1 W11slihigton Counts•Commissioners 221001919' 0.43_Lcres ,f 5 s � �1 r Legend N Roads w 'JE 1244 Frederick Street Property Boundaries S \L 0 50 100 200 Feet § ) ! § § [ § \ § \\\ \\ \ \ \ \\ \\ \\ ! \\� \\\ \\\\ \ } \\\\\\\ \\\ \ \\\ \ \\\\\ - \\\ \ _ \ \ \ y \ \= : -> == \\ \ }� \� \ �\\\ \\ \\ \ \ = = \ 5= 9= 55= )\ [ [ 5522 [) 22 Z!/!)/([ 552 5 222 !}) ! 22 Z)))/{ [Z( )/l 222 � u � y O H L G) 6 W O u O N — d 'O v C - 0 W t ( EE - fp O E +O+ O N O - ~ - �9 - O O - E d° E o• ° O i O• o E E E 0 LCC L LCC a L E ° E ° 3 E o `' ° o-°• Z C &o °Pi &o ° &= & ° °P v- _ 3 " Z N L _ 7 N 3= \ d d F C E - �_f �� 3 �- - - m � U ++ Y II y ++ ii s s _ E a v a = - m E v m o _o ; d ° _ _ - d C D O L L__ - O. W W K V V) In E F7 F7 e E E F7 F7 F7 F7 F7 F7 F7 F7 E u G Y Y E E _? E E E E E ' E ' E ' E ' t 3 E _ E E E E E E E 0 0 3 a - > > z = < z = _ > > _ _ 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 I x x x ¢ x x x x x x x x x x x x a a a a a a a a a 3 3 3 3 3 3 3 3 z° z° a "qa o a "qa o ¢ 0 0 0 0 0 0 0 0 0 a u o ..,.._z ,_.o.. G o o x w z w w w 3 ti 3 m o z z Y w Y Z o 8 z o o 0 0 o -w o x x -u x Y x o J LL a m o <m ? Q m ? Q m ? Q m o g x o a z F z LL o 3 LL z w a a a 0 m. g 0 m o > o 0 0 o z o v, ¢LL LL 5 3 O "¢ o o LL o 00 o LL o m o o LL o m 0 o LL F Z x O N Y Z N O O Z N m 0 ≥ LL p w z Z Z ti Q m Z Z ti Q m Z Z ti Q m Z Z., w Z O Cf z a O mO J Q O LL O F Z co m0 OO u wp r O 2Iz >.o0 0 z 0 z 0 LLoO �3N w. x �o ¢o z �oo o �3 ._zo03 LL �m J _ LL �m J _ LL25 J _ LL� m o o ¢ z z o F w o o O o ? LL o G o a o z o w - z o z F z xzY o x z Y o x z Y o x z t 2 o t z z o m o m o m o a o z o z o z o mz z o z u o u o u o � o 0 00 0 � oN 0 � 0 --------- .., ------_.... am o o ti ti ti N N N 0 ---------------------------------------------------------------- ------------------------------------- o a A o 0 0 6 6 6 ----------- --------------------------------------- --------------------------------------- 3 3 3 3 3 3 v Y m .E v _ v v v av ¢ v¢ v ¢ v ¢ v ¢ v¢ 3 -----------------------------...----------------------------------------------------�...._....._._..._.....__....._....._. .._-------------..._...-------------------------------------_.. N o 2 N N ry 3 N N N ry n p p p p p p p p p p E E E E E E E E E E 3 3 3 3 3 3 3 3 3 s s s s s s s s s 0 0 0 0 0 0 0 0 0 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 E E E E E E E E E E a a a a a a a a a a 3 3 3 3 3 3 3 3 3 3 0 0 0 0 0 0 0 0 0 0 u u u u u u u u u z o o z o 8 z o o z o o z o 8 z o o z o o z o 8 z o o z 0 O o o ¢ o ¢ o o ¢ o o¢ o ¢ o o¢ o o¢ o ¢ o o¢ 0 0 w w w w w w w w w w o <¢ z o <¢ z o<¢ z o< ¢z o< ¢z o< ¢z o< ¢z o< ¢z o <¢z o a m ¢ m ¢m ¢m ¢m a m a m a m a m ¢m 0 0 0 LL o 0 0 LL o 0 0 LL o 0 0 LL o 0 0 LL o 0 0 LL o 0 0 LL o 0 0 LL o 0 0 LL o 0 0 LL z w z w z w z w z w z w z w z w z w z w g 0 5 0 0 5 0 0 5 0 0 5 0 0 0 5 0 0 0 5 0 0 0 5 0 0 0 5 0 0 0 5 0 0 0 5 O 0 z z ¢o z z ¢o z z¢o z z¢ o z z¢ o z z¢ o z z¢ o z z¢ o z z ¢o z z¢ o z F Nci O V z F Ci O V z F Ci V z F Nci O V z F Nci O V z F Nci O V z F Nci O V z F Nci O V z F Nci O V z F Nci O V o x z o x z o x z o x z I o x z I o x z I o x z I o x z 1 o x z I o x z 0 0 0 0 0 0 0 0 0 o z 0 z 0 z 0 z 0 z 0 z 0 z 0 z 0 z 0 S u o u o u o u o u o u o u o u o u o a o Q o Q o Q o Q o Q o Q o Q o Q o Q o w 3 3 3 3 3 3 3 3 3 o f o f o f o f ' E ' E o f o f o f - w ¢ w ¢ w ¢ w¢ w¢ w¢ w¢ w¢ w { { o G | G G \ \ E E Ji ! ° ; J \ . , \ 0) 00000 { ) ) } \ f {/ ] « f / - : - ® § { 9 ( \ ) ) \ \ ) \ ] j / Rebecca L. Flora, AICP, LEED ND/BD+C, Secretary Wes Moore, Governor Elizabeth Hughes, MHT Director and Aruna Miller, Lt. Governor ' State Historic Preservation Officer Maryland DEPARTMENT OF PLANNING MARYLAND HISTORICAL TRUST February 2,2024 Rhiannon A. Dodge,P.E. RK&K 159 Plaza Drive Keyser,WV 26726 Re: East Water Street Streetscape Improvements Town of Smithsburg,Washington County,MD Dear Ms. Dodge: Thank you for your recent letter regarding the above-referenced project. The Maryland Historical Trust(Trust) previously commented on the proposed undertaking by letter dated 17 April 2023.We are writing to continue consultation and provide additional information in accordance with Section 106 of the National Historic Preservation Act and the Maryland Historical Trust Act of 1985, as appropriate. As previously established,the Town of Smithsburg proposes a streetscape project along East Water Street that involves sidewalk and storm drain improvements,replacement of the water main system, and lining or replacement of the sewer main system along Water Street from Veterans Park to Smithsburg Pike(MD 64). The project is partially located within the Smithsburg Historic District(MIHP No. WA-IV-259). This historic district was determined eligible for listing in the National Register of Historic Places in 2004 and contains 162 properties dating to the nineteenth and early twentieth centuries that contribute to the significance of the district. Your recent letter inquired about the relevance of a stone arch culvert located in the vicinity of 23 East Water Street. We have reviewed the photographs included with your project materials and consulted existing survey documents in our archives. East Water Street was established around 1813-1814 with major alterations during the 1870s to the elevation of the road in the immediate vicinity of the culvert. It is likely that the culvert dates to one of these 18th century campaigns. Since it still retains modest integrity,the Trust believes that the stone arch culvert contributes to the significance of the historic district. Alteration of the structure in a manner inconsistent with the Secretary of the Interior's Standards for the Treatment of Historic Properties could result in an adverse effect finding for this project. To continue the Section 106 consultation for this undertaking,please submit the following information: • Please indicate all federal or state funds/permits/involvement to confirm that the project is subject to Section 106 regulations and/or MHT Act. • Please provide a more detailed description of the proposed project and include preliminary plans when available. Be sure to highlight areas of disturbance and specify the proposed streetscape materials (i.e., sidewalk,retaining walls,vegetation removal and replacement,etc.). Please endeavor to replace areas of brick sidewalk in-kind. Maryland Historical Trust • 100 Community Place • Crownsville • Maryland • 21032 Tel: 410.697.9591 • toll free 877.767.6272 • TTY users: Maryland Relay • MHT.Maryland.gov Rhiannon A.Dodge,P.E. East Water Street Streetscape Improvements Page 2 Once we have received the additional information requested in this letter,the Trust will continue its review of the undertaking and provide appropriate comments and recommendations,including the need for any archeological investigations. If you have questions or require further assistance,please contact Beth Cole(for archeology) at beth.cole@maryland.gov or me(for the historic built environment) at tim.tamburrino@maryland.gov. Thank you for providing us with this opportunity to comment. Sincerely, Tim Tamburrino Preservation Officer TJT/202400087 Cc: Meghan Jenkins(Washington County HPC) !non MARYLAND ASSOCIATION of Historic DistricT Commissions SAVE -THE- DATE 2024 MAHDC Annual Symposium "Climate Change and Disaster Resilience & Preservation and the Heritage of Underrepresented Communities" and Annual Meeting Thursday, May 23, 2024 8:30 a.m. to 5:30 p.m. Followed by the Prince George's County Historic Preservation Commission's Annual Maryland Preservation Month Reception 6:30 p.m. - 8:30 p.m. at the Newton-White Mansion 2708 Enterprise Road, Mitchellville MD 20721 Join us for a day-long program for Maryland's Historic District Commissions and their partners. DETAILS ABOUT REGISTRATION & PROGRAM TO FOLLOW. HOUSE BILL 566 P3, L6, Ni 41r3137 By: Delegates Grossman, Allen, Embry, Fair, Kaiser, Kaufman, Lehman, Pruski, Stein, Taveras, and Vogel Introduced and read first time: January 24, 2024 Assigned to: Health and Government Operations A BILL ENTITLED 1 AN ACT concerning 2 State and Local Government - Real Property- Confederate Naming Prohibited 3 FOR the purpose of prohibiting a State entity or a political subdivision of the State from 4 assigning a Confederate name to real property owned by the State or political 5 subdivision; requiring certain real property to be assigned a new name on or before 6 a certain date; and generally relating to prohibiting Confederate naming of State and 7 local real property. 8 BY adding to 9 Article - General Provisions 10 Section 9-101 and 9-102 to be under the new title "Title 9. State and Local 11 Government Real Property Naming" 12 Annotated Code of Maryland 13 (2019 Replacement Volume and 2023 Supplement) 14 SECTION 1. BE IT ENACTED BY THE GENERAL ASSEMBLY OF MARYLAND, 15 That the Laws of Maryland read as follows: 16 Article - General Provisions 17 TITLE 9. STATE AND LOCAL GOVERNMENT REAL PROPERTY NAMING. 18 9-101. 19 (A) IN THIS TITLE THE FOLLOWING WORDS HAVE THE MEANINGS 20 INDICATED. 21 (B) "CONFEDERATE NAME" MEANS A NAME THAT COMMEMORATES THE 22 CONFEDERATE STATES OF AMERICA OR ANY PERSON WHO SERVED VOLUNTARILY EXPLANATION: CAPITALS INDICATE MATTER ADDED TO EXISTING LAW. [Brackets] indicate matter deleted from existing law. 111111111111111111111111111111111111 IN 2 HOUSE BILL 566 1 WITH THE CONFEDERATE STATES OF AMERICA. 2 (C) "POLITICAL SUBDIVISION" MEANS: 3 (1) A COUNTY; 4 (2) A MUNICIPAL CORPORATION; 5 (3) AN UNINCORPORATED TOWN; 6 (4) A SCHOOL DISTRICT; OR 7 (5) A SPECIAL DISTRICT. 8 (D) "REAL PROPERTY" INCLUDES STREETS, BUILDINGS, PARKS, AND 9 SUBDIVISIONS. 10 (E) "STATE ENTITY" INCLUDES ALL UNITS AND AGENCIES IN THE 11 EXECUTIVE, LEGISLATIVE,AND JUDICIAL BRANCHES OF STATE GOVERNMENT. 12 9-102. 13 A STATE ENTITY OR A POLITICAL SUBDIVISION OF THE STATE MAY NOT 14 ASSIGN A CONFEDERATE NAME TO REAL PROPERTY OWNED BY THE STATE OR 15 POLITICAL SUBDIVISION. 16 SECTION 2. AND BE IT FURTHER ENACTED, That, if real property, as defined 17 under § 9-101 of the General Provisions Article, as enacted by Section 1 of this Act, has a 18 Confederate name, as defined under § 9-101 of the General Provisions Article, as enacted 19 by Section 1 of this Act, on the effective date of this Act, the State entity or political 20 subdivision of the State responsible for assigning a name to the real property shall assign 21 a new name to the real property on or before January 1, 2027. 22 SECTION 3. AND BE IT FURTHER ENACTED, That this Act shall take effect 23 October 1, 2024. HOUSE BILL 870 L2, Ni 41r2670 CF SB 836 By: Delegate Grossman Introduced and read first time: February 2, 2024 Assigned to: Environment and Transportation A BILL ENTITLED 1 AN ACT concerning 2 Washington County— Abandoned Cemetery— Acquisition and Disposition 3 FOR the purpose of authorizing the County Commissioners of Washington County to 4 acquire by purchase or condemnation certain property on which a cemetery is located 5 if the acquisition is for certain preservation purposes and ownership of the property 6 cannot be determined or the organization established to operate the cemetery no 7 longer exists; authorizing the county commissioners to transfer the property 8 acquired by purchase or condemnation to a nonprofit organization that enters into a 9 certain agreement; and generally relating to the authority of Washington County to 10 acquire property on which a cemetery is located. 11 BY repealing and reenacting, with amendments, 12 Article — Local Government 13 Section 12-412 14 Annotated Code of Maryland 15 (2013 Volume and 2023 Supplement) 16 SECTION 1. BE IT ENACTED BY THE GENERAL ASSEMBLY OF MARYLAND, 17 That the Laws of Maryland read as follows: 18 Article — Local Government 19 12-412. 20 (a) (1) The County Commissioners of Washington County may acquire 21 property or any interest in property by purchase, gift, or condemnation to acquire, 22 construct, or maintain a railroad line, if the county commissioners: 23 [(1)1 (I) determine, by resolution, that the railroad line will help preserve 24 and attract industry and promote economic growth in the county; and EXPLANATION: CAPITALS INDICATE MATTER ADDED TO EXISTING LAW. [Brackets] indicate matter deleted from existing law. 111111111111111111111111111111111111 IN 2 HOUSE BILL 870 1 [(2)] (II) solicit bids and hold a public hearing in the same manner as 2 required for other public property in the county. 3 [(b) (1)] (2) (I) If the State builds or acquires a railroad line in 4 Washington County, the County Commissioners of Washington County may contribute a 5 reasonable amount toward the cost of the railroad line from the general funds of the county. 6 [(2)] (II) Before the county commissioners spend money under this 7 subsection, the county commissioners shall comply with the requirements for acquisition of 8 property for a railroad under [subsection (a) of this section] PARAGRAPH (1) OF THIS 9 SUBSECTION. 10 (B) (1) THE COUNTY COMMISSIONERS OF WASHINGTON COUNTY MAY 11 ACQUIRE PROPERTY OR AN INTEREST IN PROPERTY BY PURCHASE OR 12 CONDEMNATION IF: 13 (I) A CEMETERY IS LOCATED ON THE PROPERTY; 14 (II) THE PURPOSE OF ACQUIRING THE PROPERTY IS TO 15 PRESERVE THE HISTORICAL NATURE OF THE CEMETERY;AND 16 (III) 1. THE LEGAL OWNERSHIP OF THE PROPERTY CANNOT 17 BE DETERMINED; OR 18 2. THE ORGANIZATION ESTABLISHED TO OPERATE THE 19 CEMETERY IS NO LONGER IN EXISTENCE OR HAS BEEN DISSOLVED THROUGH AN 20 ADMINISTRATIVE ACTION BY A UNIT OF THE STATE. 21 (2) THE COUNTY COMMISSIONERS OF WASHINGTON COUNTY MAY 22 TRANSFER PROPERTY ACQUIRED BY PURCHASE OR CONDEMNATION UNDER 23 PARAGRAPH (1) OF THIS SUBSECTION TO A NONPROFIT ORGANIZATION THAT 24 AGREES TO PRESERVE THE HISTORICAL NATURE OF THE PROPERTY. 25 SECTION 2. AND BE IT FURTHER ENACTED, That this Act shall take effect 26 October 1, 2024. MEETING SUMMARY THE UNITED STATES 250TH I HISTORIC SUBCOMMITTEE FOR WASHINGTON COUNTY Page 1 January 29th, 2024 The United States 250th Historic Subcommittee for Washington County held its regular monthly meeting on Monday January 29th, 2024 at 11:00 a.m. in the Washington County Public Safety Training Center, 18350 Public Safety Place, Community Room, Hagerstown, MD. Members Present: David Wiles, George Messner,Jefferson Boyer, Rachel Nichols, Rick Hemphill Staff:Washington County Department of Planning&Zoning: Meghan Jenkins, GIS Coordinator and HDC Staff member. Discussion Buildings and the power of place from the 250th Field Guide were discussed at this meeting. Members were prompted in varying ways to elicit responses regarding this topic. Some of these prompts included: What are some buildings or places of importance during the founding period?What Federal, State and Local properties are important for the public?What geographic characteristics are unique or important or have changed?What hasn't been expanded upon or promoted regarding buildings/geography in the past or is unfinished research/projects? Potential Building/Research Projects for collaboration: 1. Fort Frederick Focus: a. 3rd Barracks building reconstruction at Fort Frederick was not completed with the bicentennial. While State owned, a collaboration with the County to complete the project or host archaeology at the fort would be beneficial for citizens. b. The African American schoolhouse reconstruction project (Nathan Williams African American Heritage Walking Tour(maryland.gov) 2. South Mountain Inn: a. This was recently purchased by the State. Determination of plans and whether they will come to fruition and can be tied to the 250th planning and tour efforts. 3. Building to the left of the Miller House (WCHS) is up for sale and would provide additional exhibit space and an anchor for celebrations/collections on loan for the 250th• MEETING SUMMARY THE UNITED STATES 250TH I HISTORIC SUBCOMMITTEE FOR WASHINGTON COUNTY Page 2 4. Creation of a park, parks programming or upgrade/addition to parks themed with the 250th a. Weverton-Roxbury Rail Trail partial segment opening/breaking ground during 250th celebrations b. Having some landscaping in County parks which mimics historic types/uses (some done at Ag Center but could expand to other parks or promote/expand ag center. c. Price's Bridge restoration and park creation similar to Wilson Bridge. Built in 1822 however it would be a great promotional park for the centennial if it gets added back to the roster of remaining bridges. https://washingtoncountyhistoricaltrust.org/17-prices-bridge-1822-conococheague- creek-west-of-cearfoss-md/ or apps.mht.maryland.gov/Medusa/PDF/Washington/WA-I-291.pdf d. Potential Park with view of bridge at Old Forge (Strickland 20607 Old Forge, n/s old forge smaller parcel) 5. Historic Preservation Overlay of property on Greencastle Pike. Sandy Izer may have more documentation than what's provided on the MIHP for barn. 11818 Greencastle Pike MIHP 1354 https://apps.mht.maryland.gov/Medusa/PDF/Washington/WA-I-354.pdf Property was previously marked eligible for National Register and is threatened by development. Recent change in ownership to a Fulton LLC from Reichard/Neikirk family. Potential Programming/Places/Events for collaboration: 1. Dalghren Chapel (Frederick County) as a potential tie in for a driving tour or be collaborative with other locations in adjacent counties. 2. MAC lab may have exhibit/potential loans if space available 3. Scouts of America Jamboree at Ft. Frederick or other County location 4. Commemorative Markets (downtown example) 5. Clear Spring Historic District— Fort Frederick, George Washington artist prints a. Washington visited Fort Frederick at least 2 times as documented.The CSHD has discussed commissioning an artist's rendering/print to show him walking into the fort. 6. 100's Commemorative Markers wmd1776.ipg (1869x950) (rootsweb.com) a. Hundreds were formed on sections of land with 100 "taxables"(males, age 16 and older and male and female slaves, age 16 and older). Unoccupied land could be included in these 'tracts'and each was given a distinct name and had a constable assigned to keep order, much like later Sheriffs. When first established, it probably consisted of a greater area, but as time passed and the population increased, more Hundreds would be established from it and the old Hundred would decrease in size. (This may well be similar to the townships one finds in Pennsylvania today.) These Hundreds were later replaced with districts which usually were named after the town it included and/or a district number. In 1777, tax assessments were made on the value of the real and personal property of the head of the household and the "taxables"method was no longer used. The Hundreds were gradually phased out and Districts replaced them. MEETING SUMMARY THE UNITED STATES 250TH I HISTORIC SUBCOMMITTEE FOR WASHINGTON COUNTY Page 3 7. Promote or expand upon the Maryland Century Farm program and recognize farms that may coincide with the 250th milestone as well. https://mda.maryland.gov/farm to school/Pages/Century Farms.aspx a. Berman Lee Hixon, Berman Lee Hixon Farm b. Robert W Cline, Elmer T Cline Farm c. Eric Seifarth, Felfoot Farm d. David Shinham, Bur Oak Farm e. Richard Newcomer, Green Meadows f. Lowell T & Linda Hixon, Hixon Farm g. Frank& Larry Artz, Idel Hour Farms h. Roy& Betty Byers, Linden Hall i. Lawrence& Hazel Long, Long Farm I. Scott Poffenberger, MM Ranch k. Charles&Ailien Downs, Montpelier 8. The impacts of early land patents and potentially displaying those patents at an exhibit space to highlight the family names and the way they re-shaped the geography and what the land was used for.This could tie into the Clerks for the County, County Courthouse coming later,the structure of"government" at the time.The first clerk being Otho Holland Williams (Williamsport) and where/what documents were at the time legal documents. 9. Expand on the history of the naming of the County.Who were the participants in the petition for naming and highlight the timing of it being named "Washington" so early after the declaration was signed.This may tie into the land patents and legal documents discussion because some records may be at Annapolis in the hall of records there as local Court House wouldn't have some of the earliest documents. 10. Highlight the Furnaces/early industry.These were basis for large land patents and had families associated with them which are important to the County's history. Forges were important for munitions in war effort. a. Mt Aetna Furnace—Hughes family (associated with Old Forge Farm) b. Antietam Furnace—also Hughes family c. Green Spring Furnace—Jacques family, house with potential G.W. stay 11. Initial buildings of note: a. Hager's Fancy(Hager House) 1739 (City of Hagerstown) b. The Hive (associated with Fitzhugh Family washingtoncountyhistoricaltrust.org/7- the-hive-circa-1850-near-chewsville-md/ c. Frog Hollow—Van Lear—Hoys d. Springfield Farm- Stillhouse 1750, Stonehouse 1740's, Frame/Brick 1764-1879, Barn 1776-1880 e. Old Forge Farm 1762 f. Good Hartle Farm 1765 g. Antietam Hall 1769 h. Rohrer House 1770 i. Trovinger Mill—1771 MEETING SUMMARY THE UNITED STATES 250TH I HISTORIC SUBCOMMITTEE FOR WASHINGTON COUNTY Page 4 I. Middlekauff-Poffenberger Farm— 1756/1820 k. Jacob Hess House—1760 I. Robert Claggett Farm—1770-1790 m. Rockland Farm 1773 n. Cedar Grove 1760 o. Keedy House 1776 12. Rather than focus on the date of structures, look at and promote structure types unique to the County; could pursue additional National Historic Landmarks since we only have 3 a. Focus on Stone houses (some listed above are that construction type); discuss the layouts that made these early houses unique and the Germanic heritage they represent b. Promotion of the Stone Arch Bridges which are early 19th century and not necessarily in the founding period but are an important historic element to the landscape and fit the 250th themes (using existing tour map, revamp?) see also the potential projects with Price's Bridge c. Forts and their creation/use should be highlighted and association with families of the County since early forts were not all "Ft. Frederick" I. Ft.Tice (Cearfoss) ii. St. Pauls (first) iii. Blockade House, Cedar Ridge, Conococheague d. Mill Complexes e. Stone Walls/Fences f. Bank Barns g. Churches of varying architectural styles and denominations h. Schoolhouses i. Markers (National Pike and Mason Dixon 13. Rural Villages—promote through signage and additional research. Example Yarrowsburg and its association with Mamoud Yarrow who worked at the nearby furnace—portraits at Georgetown University 14. Investigate roadways and their historic layout and point out milestones of the County a. First Concrete Road in County—MD Route 66? b. Macadam National Road—Boonsboro National Road Museum c. Existing County Roads that have "old alignments" could be explored for mapping or road tour ex. Old Forge d. Markers on State Routes such as Leitersburg Pike/Smithsburg Pike using State highways markers—Could use this mark the 100's or Rural Villages e. Native American trails and crossings typically following springs/sides of mountains were used; local historical societies may have a better idea where these were and they could be mapped as well. 15. Highlight the ways into and out of the County during the time period a. "The Gaps" on the east side of the County including Fox's, Cramptons (NR) and their history MEETING SUMMARY THE UNITED STATES 250TH I HISTORIC SUBCOMMITTEE FOR WASHINGTON COUNTY Page 5 b. River Crossings i. Ft. Frederick (McCoys) ii. Watt's Ferry Williamsport iii. Four Locks iv. Sharpsburg v. Hancock vi. Harpers Ferry c. Note the geography at the time was more open and less wooded and set the scene since there were not a lot of permanent Native American settlements throughout the County, most near Antietam and Ringgold. See research of Andy Stout d. Note the influence of Philadelphia, PA and Winchester, VA at the time. Many travelers/residents were coming through Philadelphia. 16. Older Place Names and their origins should be explored with help from historical societies and libraries a. Example Quirack, Cavetown and why it's the name of the district rather than Smithsburg, Rural Villages like Yarrowsburg, Older place names colloquially 17. Tie in with Park Quest—at State Park level with similar programming. like History Quest 18. Reactivate Museum Ramble ahead of the 250th if possible 19. Mimic the Clear Spring Passport (example coin provided).